Final | 5/23/2016 | 5/24/2016 | 5/24/2016 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson Corrections fixed final ok
|
Final | 5/23/2016 | 5/23/2016 | 5/23/2016 | P | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson 410.10(d) luminaires located with 8' vertically and 3' horizontal of a bathtub rim or shower threshold shall be marked wet located rated 353.30(a) PVC shall be supported within 3' of a cabinet
|
Electrical Rough-In | 4/28/2016 | 4/28/2016 | 4/28/2016 | A | PASS |
Rex Boyles
|
|
|
Floor Heat In master bath---Call ###-#### for key location Phone #: ###-#### Inspection requested via web by Therrin Robertson r/i ok
|
Rough-In Permanent Service | 3/9/2016 | 3/9/2016 | 3/9/2016 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Therrin Robertson rough-in ok cover p/s u/g n ok
|