Final | 3/30/2017 | 3/31/2017 | 3/31/2017 | A | PASS |
James Ady
|
|
|
final on pool and equipment Phone #: ###-#### Inspection requested via web by Kevin Koomler final ok
|
Conference | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | CANC |
James Ady
|
|
|
swimming pool, equal potential - Kevin Phone #: ###-#### needed rough in
|
Electrical Rough-In | 2/22/2017 | 2/22/2017 | 2/22/2017 | P | PASS |
James Ady
|
|
|
swimming pool, equal potential - Kevin Phone #: ###-#### Equipotential Bond ok to cover.
|
Electrical Rough-In | 11/8/2016 | 11/9/2016 | 11/9/2016 | A | PASS |
Rock A. Hudson
|
|
|
bonding of stem walls at pool area Phone #: ###-#### Inspection requested via web by Kevin Koomler #8 stub to inside of pool bar area, needs to tie to perimeter bond. Stem wall bond rough in ok cover
|
Electrical Rough-In | 7/27/2016 | 7/28/2016 | 7/28/2016 | P | PASS |
Bob Reichert
|
|
|
Kevin-bonding insp and underground cover Phone #: ###-#### u/g and pool bonding ok
|