ELE-Aging Inspection | 3/4/2019 | 3/4/2019 | 3/5/2019 | | PASS |
Mark Moncarr
|
|
|
Schedule this inspection and approved final. Corrections were made.
|
Final | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PASS |
Mark Moncarr
|
|
|
Ok final. Corrections made.
|
Final | 3/16/2016 | 3/17/2016 | 3/17/2016 | A | CANC |
Eric Story
|
|
|
Brandon Phone #: ###-#### needed p/s
|
Permanent Service | 3/17/2016 | 3/17/2016 | 3/17/2016 | P | PASS |
Eric Story
|
|
|
Brandon Phone #: ###-#### p/s u/g n ok
|
Final | 3/15/2016 | 3/16/2016 | 3/16/2016 | A | FAIL |
Eric Story
|
|
|
Brandon Greeson is contact at ###-####. thank you. Phone #: ###-#### Inspection requested via web by Debby Pierce 110.24 available arc fault calculation required prior to being energized 110.16 arc flash sticker required
|