Final | 4/18/2016 | 4/18/2016 | 4/18/2016 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Brandon Hillman master floor heat final ok
|
Final | 3/23/2016 | 3/23/2016 | 3/23/2016 | P | CANC |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Brandon Hillman needed cover for floor heat
|
Electrical Rough-In | 3/23/2016 | 3/23/2016 | 3/23/2016 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Brandon Hillman master floor heat ok cover
|