Final | 4/5/2016 | 4/5/2016 | 4/5/2016 | P | PASS |
Rex Boyles
|
|
|
Call Steve if there''s any questions; 8 new offices on the 2nd floor; obtain visitors pass from front desk Phone #: ###-#### Inspection requested via web by Steve McCloy final ok perm. occupancy ok
|
Electrical Rough-In | 3/24/2016 | 3/25/2016 | 3/25/2016 | A | PASS |
Rex Boyles
|
|
|
2nd floor offices; walls ; ceilings; Phone #: ###-#### Inspection requested via web by Steve McCloy r/i ok walls and tgrid ceilings ok to cover
|
Final | 3/24/2016 | 3/25/2016 | 3/24/2016 | A | CANC |
Rex Boyles
|
|
|
2nd floor offices; walls & ceilings; call when in route if possible. Phone #: ###-#### >> Inspection requested via web by Steve McCloy Inspection cancelled from web by: Steve McCloy
|
Electrical Rough-In | 3/24/2016 | 3/24/2016 | 3/24/2016 | A | CANC |
Rex Boyles
|
|
|
2nd floor office ceilings & walls; call when in route if possible. Phone #: ###-#### >> Inspection requested via web by Steve McCloy Inspection cancelled from web by: Steve McCloy
|
Electrical Rough-In | 3/23/2016 | 3/24/2016 | 3/24/2016 | A | CANC |
Rex Boyles
|
|
|
Call Steve when in route if possible. Phone #: ###-#### >> Inspection requested via web by Steve McCloy Inspection cancelled from web by: Steve McCloy
|