DOC - Permit Finaled | | | 3/7/2018 | | DONE |
|
|
|
Rough-in only (electrican deployed) see ELE16-02260
|
Electrical Rough-In | 6/13/2016 | 6/14/2016 | 6/14/2016 | P | PASS |
Rock A. Hudson
|
|
|
Lee-would like late pm if poss Phone #: ###-#### Phase 2 entry walls rough in ok cover
|
Electrical Rough-In | 4/28/2016 | 4/29/2016 | 4/29/2016 | P | PASS |
Rex Boyles
|
|
|
ceiling - Kevin Phone #: ###-#### r/i ok t grid ceiling in phase 1
|
Electrical Rough-In | 3/28/2016 | 3/28/2016 | 3/28/2016 | P | PASS |
Rex Boyles
|
|
|
Lee Phone #: ###-#### r/i walls ok phase 1 ( relocate security check area)
|
Electrical Rough-In | 3/25/2016 | 3/28/2016 | 3/28/2016 | A | NH |
Rex Boyles
|
|
|
Lee Phone #: ###-#### called twice to get directions no answer
|