Final | 5/24/2017 | 5/25/2017 | 5/25/2017 | A | PASS |
Eric Story
|
|
|
Ken Phone #: ###-#### Bathroom remodel final ok
|
Electrical Rough-In | 12/7/2016 | 12/8/2016 | 12/8/2016 | P | PASS |
Eric Story
|
|
|
Please call ahead for access, for floor heat - Ken Phone #: ###-#### Back bath floor heat ok cover
|
Electrical Rough-In | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | PASS |
Eric Story
|
|
|
Ken Phone #: ###-#### guest bath ok cover/moving panel on over on other wall
|
Conference | 3/28/2016 | 3/29/2016 | 3/29/2016 | P | DONE |
Rex Boyles
|
|
|
Ken// please call before Phone #: ###-#### discuss bathroom r/i and trim requirments and floor heat r/i requirements
|