Final | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher correction fixed final for service change and tesla charger final ok
|
Permanent Service | 4/1/2016 | 4/1/2016 | 4/1/2016 | P | CANC |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher needed rough-in
|
Final | 4/1/2016 | 4/1/2016 | 4/1/2016 | P | FAIL |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher 240.24 no OCPD shall be higher then 6'-7" contractor will build a platform to fix this issue
|
Rough-In Permanent Service | 3/30/2016 | 3/30/2016 | 3/30/2016 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Randy Fletcher rough-in ok p/s u/g rec ok
|
Rough-In Permanent Service | 3/29/2016 | 3/29/2016 | 3/29/2016 | P | CANC |
Eric Story
|
|
|
late afternoon if possible. need ok for Idaho power to restore power. Phone #: ###-#### Inspection requested via web by Randy Fletcher change to conference
|
Conference | 3/29/2016 | 3/29/2016 | 3/29/2016 | P | DONE |
Eric Story
|
|
|
late afternoon if possible. need ok for Idaho power to restore power. Phone #: ###-#### Inspection requested via web by Randy Fletcher discussed service change and adding a disconnect in line of panel in garage to eliminate unfused conductors running surface mounted in garage
|