Final | 5/16/2016 | 5/17/2016 | 5/17/2016 | A | PASS |
Eric Story
|
|
|
The plans next to the electrical panel. Call Barry with any electrical questions ###-####. Phone #: ###-#### Inspection requested via web by Thaniel Bishop Solar array final ok
|
Final | 5/9/2016 | 5/9/2016 | 5/9/2016 | A | CANC |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Thaniel Bishop needed more time to replace a breaker
|
Electrical Rough-In | 5/5/2016 | 5/6/2016 | 5/6/2016 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Thaniel Bishop verified u/l listings and scope of work. Contractor said he would hae building permit issue figured out by the end of the day.
|
Final | 5/4/2016 | 5/6/2016 | 5/4/2016 | A | CANC |
Eric Story
|
|
|
Plans are on site by electrical panel in back yard. Phone #: ###-#### >> Inspection requested via web by Thaniel Bishop Inspection cancelled from web by: Thaniel Bishop
|