Final | 10/16/2017 | 10/17/2017 | 10/17/2017 | A | PASS |
Mark Moncarr
|
|
|
Swimming pool electrical. Access granted through gate on left side of garage. Phone #: ###-#### Inspection requested via web by Lars Johnson Ok final.
|
Electrical Rough-In | 6/13/2016 | 6/13/2016 | 6/13/2016 | P | PASS |
Eric Story
|
|
|
Potting compound - 2 lights - upper pool and overflow pool Phone #: ###-#### Inspection requested via web by Lars Johnson Pool potting compound for lights ok
|
Electrical Rough-In | 5/11/2016 | 5/12/2016 | 5/12/2016 | A | PASS |
Eric Story
|
|
|
Equipotential bonding plane, basketball sleeve bonding Phone #: ###-#### Inspection requested via web by Lars Johnson Equipotential bonding around perimeter of pool ok cover
|
Electrical Rough-In | 4/11/2016 | 4/12/2016 | 4/12/2016 | A | PASS |
Eric Story
|
|
|
Remaining underground for (1) autocover motor, (4) pool lights Phone #: ###-#### Inspection requested via web by Lars Johnson underground for conduits ok cover
|
Electrical Rough-In | 4/4/2016 | 4/5/2016 | 4/5/2016 | A | PASS |
Daryl DeGrange
|
|
|
Swimming pool electrical. Partial ug for (4) pool lights. Bonding for (4) eq plane corners, (2) line voltage lights, (1) steel/equip, (1) bball sleeves Phone #: ###-#### Inspection requested via web by Lars Johnson rough-in ok cover
|