Final | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | PASS |
Eric Story
|
|
|
There will be people working inside on the floors this afternoon, but you will be able to get into the garage to check arc fault installation. Thanks Phone #: ###-#### Inspection requested via web by Barbara Szurgot Correction fixed final ok
|
Final | 6/7/2016 | 6/7/2016 | 6/7/2016 | P | FAIL |
James Ady
|
|
|
Please call contractor (Wayne ###-####) with 1/2 hour notice so he can let you in. Phone #: ###-#### Inspection requested via web by Barbara Szurgot 210.12 a AFCI Protection reqiured in bedroom ( Master Bed)
|
Final | 5/16/2016 | 5/17/2016 | 5/17/2016 | A | CANC |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot needed rough in
|
Electrical Rough-In | 5/17/2016 | 5/17/2016 | 5/17/2016 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot master bath floor heat only ok cover
|
Electrical Rough-In | 4/7/2016 | 4/8/2016 | 4/8/2016 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot discussed with electricain on site about having a licensed electricain pulling any high voltage wires for mini-split unit. back room addition ok cover
|