Final | 6/6/2016 | 6/6/2016 | 6/6/2016 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Ron Zimmerman FInal ok
|
Final | 6/5/2016 | 6/6/2016 | 6/6/2016 | A | FAIL |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Ron Zimmerman Not ready. Call back in
|
Electrical Rough-In | 6/1/2016 | 6/1/2016 | 6/1/2016 | A | PASS |
James Ady
|
|
|
Ceiling Grid Phone #: ###-#### Inspection requested via web by Ron Zimmerman Ceiling ok to cover
|
Electrical Rough-In | 5/9/2016 | 5/9/2016 | 5/9/2016 | A | PASS |
Eric Story
|
|
|
hard ceiling rough Phone #: ###-#### Inspection requested via web by Ron Zimmerman hard lid cielings only ok cover
|
Electrical Rough-In | 5/2/2016 | 5/3/2016 | 5/3/2016 | A | PASS |
Eric Story
|
|
|
walls Phone #: ###-#### Inspection requested via web by Ron Zimmerman walls only ok to cover
|
Electrical Rough-In | 4/15/2016 | 4/15/2016 | 4/15/2016 | P | PASS |
Eric Story
|
|
|
under slab conduits Phone #: ###-#### Inspection requested via web by Ron Zimmerman conduits were already buried and prep for concrete. talked with gc and ec about this not happening in past, gc has pictures to verify install
|