Final | 8/8/2016 | 8/9/2016 | 8/9/2016 | P | PASS |
Bob Reichert
|
|
|
Jose Phone #: ###-#### ok final, signed card, phase 2
|
Electrical Rough-In | 6/8/2016 | 6/9/2016 | 6/9/2016 | A | PASS |
Daryl DeGrange
|
|
|
Jose Phone #: ###-#### rough-in ok cover classroom,hallway walls and UL listed floor boxes
|
Electrical Rough-In | 4/13/2016 | 4/14/2016 | 4/14/2016 | A | PASS |
Bob Reichert
|
|
|
would like call ahead; Jose Phone #: ###-#### e and w tool room walls ok cover
|