Final | 5/5/2016 | 5/6/2016 | 5/6/2016 | P | PASS |
Rock A. Hudson
|
|
|
Call Derek so he can meet you out there and take a panel off the roof. Phone #: ###-#### Inspection requested via web by Thaniel Bishop Final ok
|
Electrical Rough-In | 5/6/2016 | 5/6/2016 | 5/6/2016 | P | PASS |
Rock A. Hudson
|
|
|
Call Derek so he can meet you out there and take a panel off the roof. Phone #: ###-#### Inspection requested via web by Thaniel Bishop Solar install r/i ok
|
Final | 5/5/2016 | 5/5/2016 | 5/5/2016 | P | CANC |
Rock A. Hudson
|
|
|
Call Derek so he can meet you out there to get on the roof and take a panel off. Phone #: ###-#### >> Inspection requested via web by Thaniel Bishop Inspection cancelled from web by: Thaniel Bishop
|
Final | 5/3/2016 | 5/4/2016 | 5/4/2016 | A | FAIL |
Daryl DeGrange
|
|
|
Call Derek with any questions about the electrical ###-#### The plans are in the panel and everything was done at the panel outside. Phone #: ###-#### Inspection requested via web by Thaniel Bishop No access to rooftop to verify listings, no answer on phone call
|