Final | 6/13/2016 | 6/14/2016 | 6/14/2016 | A | PASS |
Daryl DeGrange
|
|
|
Call Steve when in route if possible; Obtain visitors pass from front desk. Phone #: ###-#### Inspection requested via web by Steve McCloy UL Listed cubicles final ok
|
Electrical Rough-In | 5/19/2016 | 5/20/2016 | 5/20/2016 | P | PASS |
Bob Reichert
|
|
|
Call Steve when in route if possible; obtain visitors pass from front desk. Phone #: ###-#### Inspection requested via web by Steve McCloy phase 4 ceiling ok cover
|
Electrical Rough-In | 4/17/2016 | 4/18/2016 | 4/18/2016 | P | PASS |
Bob Reichert
|
|
|
Please call when in route if possible; Obtain visitors badge from front desk. Phone #: ###-#### Inspection requested via web by Steve McCloy walls ok cover phase 4 only
|