Final | 5/25/2016 | 5/26/2016 | 5/26/2016 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Thaniel Bishop Final ok
|
Electrical Rough-In | 5/24/2016 | 5/25/2016 | 5/25/2016 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Thaniel Bishop Checked disconects and UL listing of roof top equipment. Rough in ok
|