Final | 5/9/2016 | 5/10/2016 | 5/10/2016 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by CHRIS CARMINE Hot tub Final ok
|
Electrical Rough-In | 4/27/2016 | 4/28/2016 | 4/28/2016 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by CHRIS CARMINE Perimeter bond, ladder, dive board, potting rough in ok cover
|
Electrical Rough-In | 4/25/2016 | 4/26/2016 | 4/26/2016 | A | PASS |
Rock A. Hudson
|
|
|
Bonding/grounding inpection Phone #: ###-#### Inspection requested via web by CHRIS CARMINE Underground to light and equipment pad. Bonds, 4 locations on perimeter, light, and ladder, ladder water bond. Rough in ok cover
|