Final | 7/7/2016 | 7/8/2016 | 7/8/2016 | A | PASS |
James Ady
|
|
|
Approved plans onsite. Call Ryan King with questions. Thanks Phone #: ###-#### Inspection requested via web by Ryan King Final ok
|
Electrical Rough-In | 6/22/2016 | 6/23/2016 | 6/23/2016 | A | PASS |
James Ady
|
|
|
Panel and Inverter rough-in. Please call Joziah before-hand ###-####. Thanks Phone #: ###-#### Inspection requested via web by Ryan King Rough in ok
|