Final | 7/26/2016 | 7/27/2016 | 7/27/2016 | A | PASS |
James Ady
|
|
|
2nd floor office space adjacent to new corridor Phone #: ###-#### Inspection requested via web by steve ragan Final ok
|
Electrical Rough-In | 7/26/2016 | 7/27/2016 | 7/27/2016 | A | PART |
James Ady
|
|
|
Ceiling inspection. 2nd floor office space adjacent to new corridor Phone #: ###-#### Inspection requested via web by steve ragan Ceiling only ok to cover
|
Final | 7/26/2016 | 7/26/2016 | 7/26/2016 | P | NR |
James Ady
|
|
|
2nd floor office space adjacent to new corridor Phone #: ###-#### Inspection requested via web by steve ragan Not ready Needs ceiling inspection
|
Final | 7/25/2016 | 7/27/2016 | 7/26/2016 | A | CANC |
Rock A. Hudson
|
|
|
2nd floor office space adjacent to new corridor Phone #: ###-#### >> Inspection requested via web by steve ragan Inspection cancelled from web by: steve ragan
|
Electrical Rough-In | 5/16/2016 | 5/17/2016 | 5/17/2016 | A | PASS |
Rock A. Hudson
|
|
|
Asher Sears will be the electrician onsite Phone #: ###-#### Inspection requested via web by steve ragan Small TI to right of corridor wall rough in ok cover
|