Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberELE16-01523
StatusFinaled
Name KC ENTERPRISES
Site Address 300 E MALLARD DR Unit: 350
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration: All work is on 3rd floor N..W. corner of SPF water. TI. Add, relocate, receptacles, alter switching for lighting. New walls have been framed in, electrical has been added to the new walls. Some work will be done with cut in boxes and fishing of walls.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final5/12/20165/12/20165/12/2016PPASS
DetailsBob Reichert
All new framed in wall that required electrical are roughed in. Includes power and data stubs. Work that needs inspected is on 3rd floor , go to 3rd floor turn left out of elevator, turn left at hallway, take right at open spot in sheet rock , you have successfully entered the work area. All work is visible. Other cut in work will follow. Any questions call me. Phone #: ###-#### Inspection requested via web by Kurt Carlson ri walls only ok