Final | 9/6/2016 | 9/6/2016 | 9/6/2016 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton final ok
|
Final | 8/23/2016 | 8/23/2016 | 8/23/2016 | P | PART |
Rock A. Hudson
|
|
|
Temp Occ Phone #: ###-#### Inspection requested via web by Kerri Hamilton Front covered entrance yet to complete, temp egress lighting in place. Temp final ok for training
|
Final | 8/19/2016 | 8/22/2016 | 8/22/2016 | P | NR |
Rock A. Hudson
|
|
|
Request for Temp occupancy . Call Ryan - ###-#### Phone #: ###-#### Inspection requested via web by Kerri Hamilton Outdoor egress not complete in front due to auning not in place yet. 210.8- All GFCI receptacles located in ceiling around bar shall be located in a readily accessible location.
|
Electrical Rough-In | 8/4/2016 | 8/5/2016 | 8/5/2016 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Kitchen area grid rough in ok cover
|
Electrical Rough-In | 7/18/2016 | 7/19/2016 | 7/19/2016 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Front soffits rough in ok cover
|
Electrical Rough-In | 7/6/2016 | 7/7/2016 | 7/7/2016 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Rough-in ok cover walls and ceiling grid except ceiling grid above hostess station and booth seating area
|
Conference | 6/21/2016 | 6/21/2016 | 6/21/2016 | P | DONE |
Rock A. Hudson
|
|
|
Discussed clearance on HVAC unit disconnecting means and control box. As per Daryl Degrange 24" needed 18" min when no other options exist.
|
Conference | 5/24/2016 | 5/25/2016 | 5/25/2016 | A | DONE |
Rock A. Hudson
|
|
|
8 am if possible please to coordinate with other trades Ryan Barnes Phone #: ###-#### Inspection requested via web by Kerri Hamilton Discussed dedicated electrical space for panel boards. Job has been designed with duct work over panel boards limiting dedicated space. As per NEC 110.26(E) area shall be clear width and depth of equipment from floor to 6' above or to structural ceiling. Contractor to explore other locations for panels. Also asked to change egress dor of electrical room to open out and have panic hardware installed.
|