Final | 6/1/2016 | 6/2/2016 | 6/2/2016 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by JOHN MCCURDY needed rough in inspection Bonding complete and GFCI protection installed on all circuits. Final ok
|
Electrical Rough-In | 6/2/2016 | 6/2/2016 | 6/2/2016 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by JOHN MCCURDY Underground from house to fence and ran above ground in schedule 80 to equipment panel. Rough in ok cover
|
Conference | 5/23/2016 | 5/24/2016 | 5/24/2016 | A | DONE |
Rock A. Hudson
|
|
|
I need to go over what may be the requirements to add to the electrical equipment for a swimming pool off Warm Springs. The original pool was built in 1928, but obviously has had major updates over the years. Now adding a Heat Pump, and other equipment which will result in a complete upgrade to the Electrical Equipment Remote Service located quite a distance from the main structure. Phone #: ###-#### Inspection requested via web by JOHN MCCURDY Discussed the replacement of pool equipment. New circuit from house to run underground under sidwalk and then run on surface along fence in sch. 80 to equipment pad. All circuits shall have GFCI protection as per NEC 680 and bond exists from cover and to new equipment and water bonds. Pool and perimeter grandfathered in.
|