Final | 5/16/2017 | 5/17/2017 | 5/17/2017 | P | PASS |
Eric Story
|
|
|
Call 20 mins. before // James Phone #: ###-#### Final ok
|
Electrical Rough-In | 6/28/2016 | 6/29/2016 | 6/29/2016 | P | PASS |
Rock A. Hudson
|
|
|
would like call ahead; James Phone #: ###-#### Basement rough in ok cover
|
Electrical Rough-In | 6/13/2016 | 6/17/2016 | 6/17/2016 | P | FAIL |
Rock A. Hudson
|
|
|
Call half hour before to meet // James Phone #: ###-#### 334.30- NM shall be secured with in 12" of boxes, cans and few receptacles. 10-2 and 12-2 shall be removed from cold air return 210.52- Receptacle shall be located in wall space to right of laundry. NM cable shall be located in dwall space around laundry area. Junction boxes in ceiling shall remain accessible.
|
Conference | 5/25/2016 | 5/26/2016 | 5/26/2016 | P | DONE |
Bob Reichert
|
|
|
James Phone #: ###-#### talked about basement remodel, free length conductor, strapping, outlet spacing, afci, dedicated laundry circuit, gfci, when to call for inspections
|