Final | 10/21/2016 | 10/21/2016 | 10/21/2016 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey....corrections made ok to final
|
Final | 10/17/2016 | 10/18/2016 | 10/18/2016 | P | FAIL |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey.....
service outlet for a/c needs installed within 25'-210.63
over 2' without an outlet-dining room-210.52
both island outlet and pennisula outlet - wire needs protection from physical damage, boxes are not rated for use, and box on island has been modified-110.3(a),110.3(b),110.7
hood circuit needs breaker lockout installed
|
Electrical Rough-In | 8/30/2016 | 8/30/2016 | 8/30/2016 | P | PASS |
Mark Moncarr
|
|
|
Floor heat in master Phone #: ###-#### Inspection requested via web by Neal Rumsey floor heat ok to cover.
|
Final | 6/1/2016 | 6/3/2016 | 6/3/2016 | A | CANC |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey Needed r/i p/s
|
Rough-In Permanent Service | 6/3/2016 | 6/3/2016 | 6/3/2016 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey Rough-in ok cover p/s u/g n ok
|