Final | 9/27/2016 | 9/27/2016 | 9/27/2016 | P | PASS |
Daryl DeGrange
|
|
|
Robert is the onsite contact Phone #: ###-#### Inspection requested via web by Buster Bowen final ok
|
Final | 9/21/2016 | 9/22/2016 | 9/22/2016 | P | PART |
Rock A. Hudson
|
|
|
Randy. Phone #: ###-#### Inspection requested via web by Sean DeLacy All equipment shall be present for final. Check GFCI protection on customer side of bar, some were some were not. Temp final for training
|
Final | 9/13/2016 | 9/16/2016 | 9/16/2016 | A | FAIL |
Eric Story
|
|
|
Robert. Temp occupancy. Phone #: ###-#### Inspection requested via web by Sean DeLacy
not ready...missing plates, lights, gfi protection...whips for heaters and equipment not installed...gfi breakers need installed for employee areas
|
Electrical Rough-In | 7/12/2016 | 7/12/2016 | 7/12/2016 | P | PASS |
Rock A. Hudson
|
|
|
Robert. Wall cover kitchen area. Phone #: ###-#### Inspection requested via web by Sean DeLacy Kitchen area walls and ceiling rough in ok cover
|
Electrical Rough-In | 6/27/2016 | 6/28/2016 | 6/28/2016 | P | PASS |
Rock A. Hudson
|
|
|
Robert. Wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Wall rough in ok cover
|
Final | 6/23/2016 | 6/24/2016 | 6/24/2016 | P | CANC |
Rock A. Hudson
|
|
|
Robert. Ceiling cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Needed rough in inspection
|
Electrical Rough-In | 6/24/2016 | 6/24/2016 | 6/24/2016 | P | PASS |
Rock A. Hudson
|
|
|
Robert. Ceiling cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Hard lid rough in ok cover
|
Conference | 6/2/2016 | 6/2/2016 | 6/2/2016 | P | DONE |
Rock A. Hudson
|
|
|
Robert. Conference. Phone #: ###-#### Inspection requested via web by Sean DeLacy Discussed the installation of LED drivers for indirect lighting in wood slats. Drivers shall be contained in hat channel due to no way for connector to terminate at driver.
|