Final | 4/24/2017 | 4/25/2017 | 4/25/2017 | P | PASS |
Tom Saunders
|
|
|
Had final inspection for phase one in Dec 15. Would like to schedule final inspection for phase 2 tomorrow 25th. This will close the project. Phone #: ###-#### Inspection requested via web by Dale Hinman...
job complete ok to final
|
Final | 12/8/2016 | 12/9/2016 | 12/9/2016 | P | PART |
James Ady
|
|
|
I would like to schedule final inspection for phase one of the project (upstairs and downstairs). I would like to schedule rough-in inspection for the main floor and phase two. Thanks so much for your time. Phone #: ###-#### Inspection requested via web by Dale Hinman Up beds and down area final only ok
|
Electrical Rough-In | 12/9/2016 | 12/9/2016 | 12/9/2016 | P | PASS |
James Ady
|
|
|
I would like to schedule final inspection for phase one of the project (upstairs and downstairs). I would like to schedule rough-in inspection for the main floor and phase two. Thanks so much for your time. Phone #: ###-#### Inspection requested via web by Dale Hinman Need to make sure junction oxes in attic are secured and blanked. Also owner was going to add 1 recep on counter left of oven. Kitchen area only ok to cover
|
Electrical Rough-In | 6/9/2016 | 6/13/2016 | 6/13/2016 | A | PASS |
Rock A. Hudson
|
|
|
Eric, I paid the additional required fee to include the electrical permit for both phase 1 ; 2. When you were here you wanted to see the electrical fan installation in the lower bathroom, you asked me to schedule. You gave approval for upper bath and bed area. Thanks so much for your time. Phone #: ###-#### Inspection requested via web by Dale Hinman Lower bath shower can and bath fan rough in ok cover
|
Electrical Rough-In | 6/6/2016 | 6/8/2016 | 6/8/2016 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Dale Hinman Master bed areas where sheetrock was removed and closets and master bath ok cover(owner will add 50$ to ele permit for future work)
|
Conference | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | DONE |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Dale Hinman Discussed code requirements for remodel tamper resistant receptacles and arc fault plus bathroom dedicated receptacles
|