Information based on query as of Thursday, June 20, 2024.
Permit Information
Permit NumberELE16-01838
StatusFinaled
Name LEA ELECTRIC LLC
Site Address 1099 W FRONT ST
Project NameSimplot Office Building
Customer Number2014-08
ePlanReviewNo
Description
New: Electrical Installation in T.I. portion of Simplot Office Building, including all fixtures, panels, gear, switches, wiring, receptacles, conduit, and fire alarm.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/12/20177/12/20177/12/2017PPASS
DetailsRock A. Hudson
Contact Tony for level 5 Lab 3 Autoclave hookups and sign off of project on hard card. Phone #: ###-#### Inspection requested via web by Tom Betty
Final ok
Final6/28/20176/28/20176/29/2017PPART
DetailsRock A. Hudson
Contact Tony Keen for TCO of level 5 lab and sign document in Hoffmans office. Phone #: ###-#### Inspection requested via web by Tom Betty
Remaining permits for this job are
ELE13-01291 site work, ELE16-01838 TI.
3 pieces of equipment left. 5th floor lab TCO ok
Electrical Rough-In1/24/20171/25/20171/25/2017APASS
DetailsRock A. Hudson
Call Tom Hartung SWHQ Level 1 Stack2 Gathering Bar Wall Northside Phone #: ###-#### Inspection requested via web by Tom Betty
Gathering bar west side wall rough in ok cover
Final1/20/20171/23/20171/23/2017APART
DetailsRock A. Hudson
Please call Tom Hartung for TCO inspection on levels 7,8,9 of the office building. Phone #: ###-#### Inspection requested via web by Tom Betty
Level 7 board room 749-2 circuit 72-B to be locked off until table is installed. MC thru floor can not be romoved without removing drywall. All levels furniture covers some are loose on line volt and low volt sides. Some card reader low volt boxes open. Shunt trip locations not changed as per State inspectors request, general contractor hoping for variance.
Signed TCO on HQ.
Final1/19/20171/19/20171/19/2017APART
DetailsRock A. Hudson
Levels 5 and 6 HQ TCO. call Brandon Phone #: ###-#### Inspection requested via web by Brandon Robinson
Lab excluded 5, 6 TCO ok
Final1/16/20171/17/20171/17/2017APART
DetailsRock A. Hudson
Level 5 Annex TCO. call Brandon Phone #: ###-#### Inspection requested via web by Brandon Robinson
Level 5 Annex TCO ok.
Signed progress sheet in Hofman office for HQ fl 1-4 flood areas and Annex level 5
Final1/12/20171/13/20171/13/2017APART
DetailsRock A. Hudson
Call Tom Hartung for final inspection of levels 1 through 4 stack 2 Office. Phone #: ###-#### Inspection requested via web by Tom Betty
Will check items noted for Annex on 11-22-16 in future.
Area noted OK occupy
Electrical Rough-In12/17/201612/19/201612/19/2016APASS
DetailsDaryl DeGrange
Call Tom Hartung Level 7 Wall Cover TI power RM 701, RM 748, RM 749 Phone #: ###-#### Inspection requested via web by Tom Betty Rough-in ok cover
Final12/5/201612/6/201612/6/2016APART
DetailsRock A. Hudson
Contact Brandon Robinson for ground level stack 4 wellness center. Phone #: ###-#### Inspection requested via web by Tom Betty Fan/ coil to complete in electrical room, floor box permenant covers to be installed when floor complete. TCO for wellness area ok
Electrical Rough-In12/1/201612/5/201612/5/2016APASS
DetailsRock A. Hudson
Call Brandon for level 1 stack 2 overhead roughin . Phone #: ###-#### Inspection requested via web by Tom Betty
Area noted repair due to flood rough in ok cover
Final11/21/201611/22/201611/22/2016APART
DetailsRock A. Hudson
Call Brandon for levels 1 through 4 Annex final sign off of TCO. Phone #: ###-#### Inspection requested via web by Tom Betty
210.8- 4th floor water heater 41E 8, 10, 12, GFCI devices shall be readily accessible.
Receptacle near dishwasher shall be GFCI protected.
422.30- Womens bath label switch located in stall up high as to its purpose.
110.3- Items to be connected as per manufacturers instructions. 2nd floor center podium floor box reverse polarity, Furniture in stadium jumpers missing. S. E. corner rows 2, 3, 5, 6. Floor boxes need trimmed N. offices and out 4 total.
TCO ok
Final11/18/201611/18/201611/18/2016PCANC
DetailsRock A. Hudson
Call Brandon for TI final levels 1 through 4 Annex and level 1 stack 1 Office. Phone #: ###-#### Inspection requested via web by Tom Betty
Contractor asked to cancel due to flood. Will recall when ready
Electrical Rough-In11/17/201611/17/201611/17/2016PPASS
DetailsRock A. Hudson
Rough in level 4 ceiling call Brandon Robinson ###-#### Phone #: ###-#### Inspection requested via web by Tom Betty
Level 4 remodel of pantry ceiling area. Ceiling rough in ok cover
Conference11/15/201611/15/201611/15/2016PDONE
DetailsRock A. Hudson
Discussed with Brandon if temp occupancy could be granted to Annex 4th floor kitchen area. Explained all core and shell areas of building must be complete. All wiring shall be in an enclosure or box and shall not be subject to physical damage. All that is complete shall be tested.
Final11/15/201611/15/201611/15/2016PFAIL
DetailsRock A. Hudson
Level 9 TI POWER Partial Phone #: ###-#### Inspection requested via web by Tom Betty
110.3- Office 935-3 needs trimmed, open boxes, drywall repair in progress.
400.8- Flexible cords shall not penetrate ceilings. Flexible cords run from 9th floor to roof and in stairways.
605.5- Furniture connections shall be complete. Most have covers and receptacles missing. Furniture whips laying on floor with ends taped.
Final11/9/201611/9/201611/9/2016PPART
DetailsRock A. Hudson
SWHQ Level 8 Power TI and Lighting TI Phone #: ###-#### Inspection requested via web by Tom Betty
Area noted temp occupancy
Electrical Rough-In11/2/201611/3/201611/3/2016PPASS
DetailsRock A. Hudson
level 5 HQ Lab ceiling. call Brandon Phone #: ###-#### Inspection requested via web by Brandon Robinson
Area noted rough in ok cover
Electrical Rough-In10/31/201611/1/201611/1/2016PPASS
DetailsRock A. Hudson
ceilings level 5 Annex- Sensory kitchen, Greenhouse support, and north corridor. Call John Phone #: ###-#### Inspection requested via web by Brandon Robinson
Areas noted ceiling rough in ok cover
Electrical Rough-In10/25/201610/26/201610/26/2016APASS
DetailsRock A. Hudson
Gathering Bar Ground Level Stack 2 Wall R-I Phone #: ###-#### Inspection requested via web by Tom Betty
Gathering bar millwork rough in ok cover
Electrical Rough-In10/24/201610/25/201610/25/2016APASS
DetailsRock A. Hudson
annex level 4 kitchen ceiling. call Brandon Phone #: ###-#### Inspection requested via web by Brandon Robinson
Area noted grid rough in ok cover
Electrical Rough-In10/22/201610/24/201610/24/2016PPASS
DetailsRock A. Hudson
level 1 stack 1 ceiling. call Brandon Phone #: ###-#### Inspection requested via web by Brandon Robinson
Customer experience N. E corner and S. E. corner 5 rooms hardlids rough in ok cover
Electrical Rough-In10/21/201610/21/201610/21/2016PPASS
DetailsRock A. Hudson
level 1 stack 4 wellness center ceiling. call Brandon Phone #: ###-#### Inspection requested via web by Brandon Robinson
Wellness baths, corridors, entries to west and east hardlids rough in ok cover.
Check accesses for clear access.
Final10/19/201610/20/201610/20/2016ANR
DetailsRock A. Hudson
Rock, I need to sign off on the permit rather than the Matrix paperwork provided by Hoffman last week. Phone #: ###-#### Inspection requested via web by Tom Betty
Official document includes all of HQ and annex. Unable to sign would release all area described on BLD permit. General contractor will develope a sheet for progress to document which areas are ready to occupy.
Final10/12/201610/13/201610/13/2016APART
DetailsRock A. Hudson
T/I Reinspection Level 2, 3, 4, 5, 6 Level 3 Stack 1 Office Furniture Phone #: ###-#### Inspection requested via web by Tom Betty Level 2- Lower ladder rack in server room not bonded.
Level 3- Low volt covers loose, North office broke MC above ceiling and cove light box open, MDF room UPS31B shall be placed to maintain work clearences on panel boards as noted in 110.26.
Level 4- Furniture low volt covers loose.
Level 5- Clear cables from all access panels installed formisc equipment above ceiling system.
Level 6- Server room upper ladder rack bonding not complete.
Level 7- Remove Otis temp power cord from wall located in elevator quad core east.
Temp occupy ok when core and shell ELE temp final granted.
Conference10/11/201610/11/201610/11/2016PDONE
DetailsRock A. Hudson
ceiling on level 4 of Annex tiles dropped in prior to inspection. Request onsite visit for direction. call John Phone #: ###-#### Inspection requested via web by Brandon Robinson
Called to discuss if kitchen area grid ok as is. Tiles installed prior to inspection. See rough in notes.
Electrical Rough-In10/11/201610/11/201610/11/2016PFAIL
DetailsRock A. Hudson
ceiling on level 4 of Annex tiles dropped in prior to inspection. Request onsite visit for direction. call John Phone #: ###-#### Inspection requested via web by Brandon Robinson
Contractor did not request inspection for kitchen area in Annex 4th floor. Grid tiles installed prior to inspection. Equipment hook ups not complete, lighting, junctions, and pull points not complete and cannot see if some areas are complete. Remove ALL ceiling grid tiles for inspection. When work complete contractor will request inspection for this area.
Conference10/10/201610/11/201610/11/2016ACANC
DetailsRock A. Hudson
Level 4 Annex ceiling was installed prior to inspection. call Brandon Phone #: ###-#### >> Inspection requested via web by Brandon Robinson Inspection cancelled from web by: Brandon Robinson
Electrical Rough-In10/8/201610/10/201610/10/2016APASS
DetailsRock A. Hudson
Level 9 ceilings, rooms 913, 939, and 942. Call Brandon Phone #: ###-#### Inspection requested via web by Brandon Robinson
Rooms noted grid rough in ok cover
Final10/3/201610/3/201610/3/2016AFAIL
DetailsRock A. Hudson
Re-inspection Level 2,3, 4, 5, 6 Stack 1,2,3,4 Phone #: ###-#### Inspection requested via web by Tom Betty
Level 2 stair 1 lighting in still need paint. Support blind cables up out of reach. Furniture covers still loose on low voltage side.
Skipped level 3.
Level 4 loose low volt covers. Furniture missing, whips in with open ends. Elevator vestibule low volt supported by EMT.
Level 5 furniture covers loose on low voltage side. Open neutral 51A 28, 30, 32.
Stack 1 lab to remain unfinished. Furniture whips in furniture missing.
Level 6 same as level 5. 62C 8 missing receptacle. Uppper ladder rack bond needed.
Level 7 not ready
250.8(A)(6)- Bonding of cable trays and ladder racks connections completed with lag type self tapping screws. Machine type thread required.
Final9/28/20169/28/20169/29/2016PFAIL
DetailsRock A. Hudson
Level 5 and Level 6 TI Power and Lighting Phone #: ###-#### Inspection requested via web by Tom Betty
110.3- furniture connections shall be installed as per manufacturers instructions. 51C-28 open neutral.
300.15- All boxes containing cables and wiring shall have covers installed.
300.21- Fire wall penetrations shall be sealed.
392.60- ladder racks and cable tray bonding shall be complete.
605.5- Furniture connections and installation shall be complete.
All hand dryer lock outs installed
Final9/24/20169/26/20169/24/2016ACANC
DetailsRock A. Hudson
Level 5 TI Power and Lighting, Equip. conn., Office Furniture, All outlets Phone #: ###-#### >> Inspection requested via web by Tom Betty Inspection cancelled from web by: Tom Betty
Final9/23/20169/23/20169/23/2016PFAIL
DetailsRock A. Hudson
Branch Circuit Panels, Branch Circuits, Equip. Conn.,Outlets, Office Furniture All LV systems Phone #: ###-#### Inspection requested via web by Tom Betty
110.3- Connect furniture as per manufacturers instructions. Furniture fed by panel 41A circuits 63, 65 not working.
300.15- All boxes containing cables shall be covered. Some blinds back ordered wiring not in boxes operates at 15 volt DC. Tie up and store neatly for future installation. Secure covers on furniture several loose.
300.21- Seal large 4x4 hole on interior of electrical room. Seal floor and ceiling when temp wiring has been removed.
392.60- Ladder racks for data cabling shall be bonded.
605.5- Connections to some furniture not complete and furniture missing.
Final9/22/20169/23/20169/23/2016ACANC
DetailsRock A. Hudson
Contact Brandon Robinson for level 4 TI lighting final. Phone #: ###-#### Inspection requested via web by Tom Betty
Needed note of prewalk of level 4 stack 1, 2, 3, 4. See conference
Conference9/23/20169/23/20169/23/2016PDONE
DetailsRock A. Hudson
Contact Brandon Robinson for level 4 TI lighting final. Phone #: ###-#### Inspection requested via web by Tom Betty
Level 4 stack 1, 2, 3,4 lighting complete
Final9/21/20169/22/20169/22/2016AFAIL
DetailsRock A. Hudson
Level 3 Stack 1,2,3,4 Power Branch Circuit Panels, Equip. Conn., Outlets, Office Furniture. LV Systems Phone #: ###-#### Inspection requested via web by Tom Betty

110.3- Furniture connections between each piece shall be complete. Panel 31A 21, 23, 25 not working. 31A 13, 15, 17 not working.
300.15- All boxes installed shall have covers. Low volt card reader, internet interface, misc.
300.15- Funiture covers missing and loose.
300.21- All penetrations in firewalls shall be sealed electrical and non electrical.
392.60- Cable trays and ladder racks bonding shall be complete.
422.30- Hardwired appliances shall have a disconnecting means. 110.25 lock out acceptable.
605.5- Office furniture installation shall be complete. Misc. not connected and level 3 stack 1 no furniture installed
Conference9/22/20169/22/20169/22/2016PDONE
DetailsRock A. Hudson
Level 3 Stack 1,2,3,4 Power Branch Circuit Panels, Equip. Conn., Outlets, Office Furniture. LV Systems Phone #: ###-#### Inspection requested via web by Tom Betty
Levels 2 and 3 stack 1, 2, 3, 4 lighting complete.
Electrical Rough-In9/21/20169/22/20169/22/2016PPASS
DetailsJames Ady
Level 1 Stack2/3 Columns Southside Lobby 100 Between Vestibule112 and 114 Phone #: ###-#### Inspection requested via web by Tom Betty Level 1 Vest 112, 114 and 4 column ok to cover
Final9/20/20169/21/20169/21/2016AFAIL
DetailsRock A. Hudson
Level 2 Stack 1,2,3,4 Branch Circuit Panels , Branch Circuit Equip conn., Branch Circuit Devices , Office Furniture Phone #: ###-#### Inspection requested via web by Tom Betty
110.3- In complete installation of office furniture all connections shall be complete. Some not connected to wiring supplied, some fed by panel 22C circuits 2, 4, 6 not working. All covers on furniture shall be installed and be securely fastened.
300.15- All boxes installed for cables, card readers, data, misc, all shall have covers installed. All covers for lighting control control panels shall be installed for TCO.
392.60- Cable trays and ladder racks in server rooms shall be completely bonded.
605.5- Complete office furniture connections.
800.110(C)(1)- All data cables shall be supported with in 3' of termination and not more than 10' between supports. Eccess loops elevator lobby, blinds, ect.
Electrical Rough-In9/19/20169/20/20169/20/2016PPASS
DetailsEric Story
Annex level 2 ceiling. call Brandon Phone #: ###-#### Inspection requested via web by Brandon Robinson
hard lid ceilings as noted ok cover
Electrical Rough-In9/17/20169/19/20169/19/2016ACANC
DetailsEric Story
Ground Level Stack 1 walls RM # 124,125,126,127,128,129,130,131,132,133,134
Conference on Article 400.7 and Aricle 400.8 in IDF Rms Phone #: ###-#### Inspection
requested via web by Tom Betty
rooms 124 through 134 walls only ok cover. Conference was not needed, decided to run conduit for ups server instead.
Electrical Rough-In9/13/20169/14/20169/14/2016PPASS
DetailsJames Ady
Level 2/ 3 Annex ceiling ( 4'' x 4'' drop in tile ), Level 9 Tectum ceiling in room 913.
Call Brandon Phone #: ###-#### Inspection requested via web by Brandon Robinson Tectum ceiling rm 913 only NO PERIMETER. Floor 2&3 annex Ceiling only ok to cover
Electrical Rough-In9/9/20169/9/20169/9/2016APASS
DetailsRock A. Hudson
Level 9 Elev. LobbyRM 901, Wellness Center Ground Level Rm 135,136,140. Underfloor Level 6,8,9. Phone #: ###-#### Inspection requested via web by Tom Betty Wellness east ok, wellness north roms ok, wellness west not ready due to heat tape, 1st floor elevator lobby receptacle and other areas noted rough in ok cover
Electrical Rough-In9/1/20169/2/20169/2/2016ANR
DetailsDaryl DeGrange
Level 3 Annex ceiling ( 4 X 4 ) tiles. Call John Phone #: ###-#### Inspection requested via web by Brandon Robinson Not ready, open j-boxes, uncapped MC for future lighting
Electrical Rough-In8/27/20168/29/20168/29/2016PPASS
DetailsRock A. Hudson
Level 7 boardroom ceiling. Phone #: ###-#### Inspection requested via web by Brandon Robinson
Area noted rough in ok cover
Electrical Rough-In8/27/20168/29/20168/29/2016APASS
DetailsRock A. Hudson
Level 3 MDF UPS Panel Including UPS XFMR , UPS Unit, UPS Panel Bonding Jumper, UPS FEEDER , UPS Panel Branch Circuits. Phone #: ###-#### Inspection requested via web by Tom Betty Area noted rough in ok cover
Electrical Rough-In8/25/20168/26/20168/26/2016PPASS
DetailsRock A. Hudson
Headquarters- Stack 1 East offices on level 2 and 4, Level 9 rooms #915 and #929, and Annex Level 5 hard lid ceilings. Phone #: ###-#### Inspection requested via web by Brandon Robinson
Floors 2, 4, 6 east offices grid.
Sky bridge hardlids floors 4, and 5.
Annex 4th floor halls north stair, east, and south stair areas ceiling foam installation.
Annex 5th floor elevator hall to west ceilings.
Annex sensory kitchen #5 ceiling.
Annex 5th floor ladies bathroom ceiling.
Areas noted rough in ok cover
300.15- Annex 5th floor mens bath lid access shall be available for HVAC unit located in ceiling. Door will not open to 90 degree angle minimum and access very limited.
Electrical Rough-In8/23/20168/24/20168/24/2016PPASS
DetailsRock A. Hudson
level 3 stack 1 ceiling. Phone #: ###-#### Inspection requested via web by Brandon Robinson
Area noted as well as under bridge ceiling rough in ok cover
Electrical Rough-In8/18/20168/19/20168/19/2016PPASS
DetailsRock A. Hudson
ceiling inspection Level 9 stack 3 and stack 2 of HQ. Level 2 multi purpose ceiling of Annex building. Phone #: ###-#### Inspection requested via web by Brandon Robinson
Level 2 annex multi-purpose room grid and level 9 stack 2 and 3 ceilings except rooms 915, 929, 939, 942, 943 not ready. Areas noted rough in ok cover
Electrical Rough-In8/17/20168/18/20168/18/2016PPASS
DetailsRock A. Hudson
level 2 annex auditorium ceiling inspection. Call John Phone #: ###-#### Inspection requested via web by Brandon Robinson ceiling in auditorium ok to cover. Drop screen motors to be cord and plug for disc.
Electrical Rough-In8/16/20168/17/20168/17/2016PPASS
DetailsRock A. Hudson
Level 5 stack 1 headquarters , Lab walls. Call John Phone #: ###-#### Inspection requested via web by Brandon Robinson area as noted wall roughin ok
Electrical Rough-In8/15/20168/16/20168/16/2016APASS
DetailsRock A. Hudson
level 9 stack 4 ceiling. call John Phone #: ###-#### Inspection requested via web by Brandon Robinson
area noted ceiling ok to cover
Electrical Rough-In8/12/20168/12/20168/12/2016PCANC
DetailsRock A. Hudson
SWHQ stair #2 levels6-9, annex core walls level 5 Phone #: ###-#### Inspection requested via web by Brandon Robinson
Wrong permit requested needed core and shell permit
Electrical Rough-In8/8/20168/9/20168/9/2016PPASS
DetailsRock A. Hudson
ceiling level 4 annex and walls on level 5 annex Phone #: ###-#### Inspection requested via web by Brandon Robinson
Areas as noted will check access 4th HVAC junction box walls and ceilings rough in ok cover
Electrical Rough-In8/5/20168/8/20168/8/2016PPASS
DetailsEric Story
Level 8 stack 3 north and stack 2 ceilings. call John Phone #: ###-#### Inspection requested via web by Brandon Robinson
level 8 stack 2&3 ceilings only ok cover
Electrical Rough-In8/2/20168/3/20168/3/2016APASS
DetailsRock A. Hudson
SWHQ Level 2 Stack 1 RM # 216, 221,222,218,223 Wall R-I Phone #: ###-#### Inspection requested via web by Tom Betty Walls as noted rough in ok cover
Electrical Rough-In8/1/20168/2/20168/2/2016PPASS
DetailsRock A. Hudson
ceiling inspection Level 8 stack 4, call John. Phone #: ###-#### Inspection requested via web by Brandon Robinson
Level 8 stack 3 south and 4 ceiling rough in ok cover.
Electrical Rough-In7/30/20168/1/20168/1/2016APASS
DetailsRock A. Hudson
Wall R-I Level 4 Stack 1 RM # 415,416,417, 418
Wall R-I Level 4 Stack 1 RM # 615,616,617,618
Phone #: ###-#### Inspection requested via web by Tom Betty Areas noted wall rough in ok cover
Electrical Rough-In7/28/20167/29/20167/29/2016APASS
DetailsEric Story
ceiling inspection level 3 of Annex building. Closer to 11 a.m. if possible. Phone #: ###-#### Inspection requested via web by Brandon Robinson
3rd floor hard lids (minus womens bathroom and entry and janitors closet) ok cover
Electrical Rough-In7/27/20167/28/20167/28/2016PPASS
DetailsEric Story
Level 7 stack 2 ceiling. Leaving out boardroom ceiling. Phone #: ###-#### Inspection requested via web by Brandon Robinson
level stack 2 (minus boardroom) ceilings only ok cover
Electrical Rough-In7/27/20167/27/20167/27/2016PPASS
DetailsRock A. Hudson
Level 2 4 5 6 underfloor Furniture Conn. Phone #: ###-#### Inspection requested via web by Tom Betty
Spot check whip connection for furniture. Listing and rough in ok cover
Electrical Rough-In7/26/20167/26/20167/26/2016PPASS
DetailsEric Story
Call Brandon Roninson for level 7 office building ceiling rough in. Phone #: ###-#### Inspection requested via web by Tom Betty
level 7 as noted on rough-in sticker hard lid and lay in ceilings only ok cover
Electrical Rough-In7/23/20167/25/20167/25/2016APASS
DetailsRock A. Hudson
Annex level 4 walls Phone #: ###-#### Inspection requested via web by Brandon Robinson
Walls as noted on contractor print. 2 areas waiting on others. Wall rough in ok cover
Electrical Rough-In7/22/20167/22/20167/22/2016ACANC
DetailsRock A. Hudson
EQDBB DIST and its 277/480v BC Panels, 120/208 v BC Panels
LSDBB DIST and its 277/480v BC Panels, 120/208v BC Panels
MDBB Dist and its associated 480 v Controllers Phone #: ###-####
Inspection requested via web by Tom Betty
Request on wrong permit.
Electrical Rough-In7/21/20167/21/20167/21/2016PPASS
DetailsRock A. Hudson
Level 7 stack 3 and 4 ceilings. Phone #: ###-#### Inspection requested via web by Brandon Robinson
Stack 3 south not ready due to low volt on ceiling support system per 300.11. 3 north and 4 hardlid rough in ok cover
Electrical Rough-In7/19/20167/19/20167/19/2016APASS
DetailsRock A. Hudson
Call John for Level 6 stack 1 ceiling rough in. Phone #: ###-#### Inspection requested via web by Tom Betty
Area noted rough in ok cover
Electrical Rough-In7/18/20167/18/20167/18/2016PPART
DetailsRock A. Hudson
level 6 stack 1 ceiling. Phone #: ###-#### Inspection requested via web by Brandon Robinson
Unable to inspect level 6 due to emergency and had to evacuate building.
Level 9 walls in rooms 939, 937, 936, 941, 913, 942, 911, 940, 938, 914, 945 coffee bar rough in ok cover.
Electrical Rough-In7/11/20167/12/20167/12/2016APASS
DetailsRock A. Hudson
level 6 stack 2 ceiling inspection Phone #: ###-#### Inspection requested via web by Brandon Robinson
Level 6 stack 1 300.11- Low volt cables shall be supported independant of ceiling support system. Level 6 stack 2 ceiling and level 8 bathroom lids rough in ok cover
Conference7/11/20167/11/20167/11/2016PDONE
DetailsRock A. Hudson
Walk Electrical Rooms Floors 2/6, Basement Electrical Rooms Phone #: ###-#### Inspection requested via web by Tom Betty
Discussed doors opening out of electrical rooms with panic hardware where needed. Transfer switches shall have grounding electrode systems and main bonding jumpers where grounded conductors are switched.
Electrical Rough-In7/7/20167/8/20167/8/2016APASS
DetailsRock A. Hudson
Level 9 Room # 924, 923, 922,925,926,927,919,920,916,928,915,929,932,
933,934,935 Phone #: ###-#### Inspection requested via web by Tom Betty
Walls for rooms as noted rough in ok cover
Electrical Rough-In7/7/20167/7/20167/7/2016APASS
DetailsDaryl DeGrange
level 2 Annex building walls and ceiling rough in. Phone #: ###-#### Inspection requested via web by Brandon Robinson rough-in ok cover
Electrical Rough-In7/5/20167/5/20167/5/2016PPASS
DetailsEric Story
ceiling inspection on the rest of level 2 stack 1 ; 2 that were not previously ready. Phone #: ###-#### Inspection requested via web by Brandon Robinson
2nd floor stack 2 storage and phone support hard lids and drop cielings ok cover
Electrical Rough-In6/30/20166/30/20166/30/2016PCANC
DetailsEric Story
level 6 stack 3 and 4 ceiling inspection. call John Phone #: ###-#### Inspection requested via web by Brandon Robinson
Level 6 stack 3@4 hard lids and suspended cielings in office areas ok cover
Electrical Rough-In6/28/20166/29/20166/29/2016APASS
DetailsRock A. Hudson
Annex building level 1 ceiling rough-in Phone #: ###-#### Inspection requested via web by Brandon Robinson
All except elevator area hardlid rough in ok cover
Electrical Rough-In6/28/20166/28/20166/28/2016PPASS
DetailsRock A. Hudson
SWHQ Room # 837, 838, 839, 840, 844, 845, 843, 834, coffee bar, 814, 850, 813, 833 wall rough-in Phone #: ###-#### Inspection requested via web by Tom Betty
Additional rooms 849, 851 wall rough in ok cover
Electrical Rough-In6/24/20166/24/20166/24/2016PCANC
DetailsRock A. Hudson
Level 1 Annex core walls rough in. Call John Phone #: ###-#### Inspection requested via web by Brandon Robinson.
Requested wrong permit
Electrical Rough-In6/24/20166/24/20166/24/2016APASS
DetailsRock A. Hudson
Room 748 Phone #: ###-#### Inspection requested via web by Tom Betty
Room 748 walls rough in ok cover
Electrical Rough-In6/22/20166/23/20166/23/2016APASS
DetailsRock A. Hudson
furniture connections on level 2, stack 3 ; 4 Phone #: ###-#### Inspection requested via web by Tom Betty Area noted listing and wiring method confirmed. Rough in ok cover
Electrical Rough-In6/22/20166/22/20166/22/2016PPASS
DetailsRock A. Hudson
headquarters level 2 stack one ceiling rough in. areas not previously ready Phone #: ###-#### Inspection requested via web by Brandon Robinson
As noted and marked on contractor print ceiling rough in ok cover
Electrical Rough-In6/17/20166/20/20166/20/2016APASS
DetailsRock A. Hudson
Stairwell 1
L6ST4, 6th Freestanding wall, columns
, L7 Rm 713, 712,
L8 Rm 843, 844, 845, 840, 839, 838, 837, 836, 834, 833, 815, 816, 817, 832, 818, 829, 819, 820, 821, 822, 829, 828, 830, 831 Phone #: ###-#### Inspection requested via web by Tom Betty.
Additional rooms noted on contractor print wall rough in ok cover
Electrical Rough-In6/16/20166/17/20166/17/2016APASS
DetailsRock A. Hudson
level 5 stacks 2,3, and 4 ceiling rough in Phone #: ###-#### Inspection requested via web by Brandon Robinson
2nd floor S. offices and 2 records and receiving rooms and a conference room as noted on contractor print. 5th floor as noted and marked on contractor print grid rough in ok cover
Electrical Rough-In6/11/20166/13/20166/13/2016APASS
DetailsEric Story
Annex level 1 wall inspection.
Headquarters level 2, stack 1 partial ceiling inspection. Phone #: ###-#### Inspection requested via web by Brandon Robinson
Annex 1 walls and level 2 stack 1 as noted on contractors paper ok cover
Electrical Rough-In6/10/20166/13/20166/11/2016ACANC
DetailsRock A. Hudson
Annex level 1 rough in at walls. Phone #: ###-#### >> Inspection requested via web by Brandon Robinson Inspection cancelled from web by: Brandon Robinson
Electrical Rough-In6/8/20166/8/20166/8/2016PPASS
DetailsRock A. Hudson
Rms 736, 725, 726, 727, 724, 742, Conference Room Stack 3, Exterior Walls and Columns core Phone #: ###-#### Inspection requested via web by Tom Betty As noted on contractor print wall rough in ok cover
Electrical Rough-In6/8/20166/8/20166/8/2016ADONE
DetailsRock A. Hudson
ceiling rough in inspection on level 3, stack 3 of headquarters, 2 conference rooms that were not previously ready. call Brandon Phone #: ###-#### Inspection requested via web by Brandon Robinson
Level 3 stack 2, 2 conference rooms lid rough in ok cover
Electrical Rough-In6/2/20166/2/20166/2/2016ACANC
DetailsRock A. Hudson
Level 1: Rms 102, 103 and conduit (in slab)
Level 2: Stack 2,3,4 Ceilings
Level 2: 212, 213, 214, 215, Stack 2 Exterior Walls, Stack 4 Soffit
Level 7: 744, 745, 746, 747, 741, 740, 739, 737, 715, 716, 718, 719, 733, 732, 731, 730 core
Level 9: Elec Room, IDF, Vestibule
Phone #: ###-#### Inspection requested via web by Tom Betty
Electrical Rough-In5/26/20165/26/20165/26/2016APASS
DetailsRock A. Hudson
Rm 808, 807 Phone #: ###-#### Inspection requested via web by Tom Betty
Walls in rooms noted rough in ok cover
Electrical Rough-In5/20/20165/20/20165/20/2016PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Tony Keen
2nd floor rms 230 and 239 walls, 4th floor lid as noted on print, 5th floor east parapet walls, 6th annex equipment area walls rough in ok cover
Electrical Rough-In5/19/20165/19/20165/19/2016PPASS
DetailsRock A. Hudson
Still in area so drove back by. 2nd floor south office walls 233 thru 237 walls and 6th floor bathroom ceilings rough in ok cover.
Electrical Rough-In5/13/20165/13/20165/13/2016PPASS
DetailsRex Boyles
Level 2 Rms: 251, 252, 253, 247, 248, 249, 212, 225, 212, 217, 216 Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok walls, walls and hardlid in bathrooms see orange on wayne's plans
Electrical Rough-In5/6/20165/6/20165/6/2016PPASS
DetailsRex Boyles
Level 4 Stack 3 Lighting/Ceiling
Level 6 643, 645 Phone #: ###-#### Inspection requested via web by Tom Betty level 4 stack3 ONLY ceilings ok not ready on level 6
Electrical Rough-In4/29/20164/29/20164/29/2016PPASS
DetailsRex Boyles
Level 6 Rms: 628, 629, 638, 622, 623, 624, 640, 641, 642, 621, 643, 644, 646, 613, 614, 647, 612, Bathroom Walls, Janitor& core#39;'''s closet Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok for above rooms ALSO r/i level 4 stack 4 ceilings ok see wayne's prints
Electrical Rough-In4/22/20164/22/20164/22/2016PPASS
DetailsRex Boyles
Level 3, Stack 2 Lighting
Level 2: 244, 225, 227, 228, 240, 241
Level 5: 518, 513, Stack 1 C;S Walls
Level 6: 634, 635, 636, 637, 638, 633, 632, 631, 630 Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok see Wayne's esheets for above areas
Electrical Rough-In4/15/20164/15/20164/15/2016PPASS
DetailsRex Boyles
Level 3 Stack 3, Stack 4 Above Grid Rough-In
Level 5 Rms: 516, 517, 522, Bathrooms core Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok look for purple highlighted ares on waynes plans
Electrical Rough-In4/8/20164/8/20164/8/2016PPASS
DetailsRex Boyles
Level 4, Stack 2 - Bathroom Shaft Lighting
Rms 535,533,532,531,530,529,528,527,526,525,524,536,537,538,521,539,541,540,543,544,545,546,547,548,549,550,551,552,553,554,555,556,557,558,559,560,515 Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok 5th flr walls marked above and on Wayne's esheets
Electrical Rough-In4/4/20164/4/20164/4/2016PPASS
DetailsRex Boyles
Rm 430, 435, 607 Phone #: ###-#### Inspection requested via web by Tom Betty 607 not ready r/i ok 430,435,707 and 708 walls ok
Electrical Rough-In3/25/20163/25/20163/25/2016APASS
DetailsRex Boyles
lvl 4. rooms 426, 425, 436, 437, 438, 439, 445, 427, 440, 441, 442, 443, 444, 446, 447, 423, 424, 422, 450, 448, 449, 455, 451, 452, 453 (?)
Lvl 5 507, 505
Lvl 6 602, 603, 607, 608 phone # ###-####0 inspection requested via web by Tom Betty r/i walls ok and 4th floor bqathrooms core and loids ceilings in these rooms see Wayne's prints with highlighted areas
Electrical Rough-In3/16/20163/17/20163/17/2016APASS
DetailsRock A. Hudson
Level 2, Stack 2

Rms 245, 251, 252, 253, 247, 248, 249, 250, 242, Janitor, Bathrooms core Phone #: ###-#### Inspection requested via web by Tom Betty r/i walls ok areas listed above. Also looked at fixtures in Fantony ceiling system. 277 volt and 0-10 MA for controlling fixtures. 0-10 MA conductors have 600 volt rating and is ok to make connections in same jbox as 277volt source.
Electrical Rough-In2/17/20162/17/20162/17/2016APASS
DetailsRex Boyles
3rd Flr TI - Rms 347, 311, 313, 314, 345, 344, 343, 342, 318, 319, 312, Corridor B, Area 010, Curtain walls, Columns Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok see Wayne"s e sheets
Electrical Rough-In1/14/20161/14/20161/14/2016APASS
DetailsRex Boyles
Room 509,510 Phone #: ###-#### Inspection requested via web by Tom Betty r/i walls ok
Electrical Rough-In1/7/20161/8/20161/8/2016APASS
DetailsRex Boyles
Rms 502, 503 Phone #: ###-#### Inspection requested via web by Tom Betty r/i walls ok
Electrical Rough-In12/8/201512/8/201512/8/2015APASS
DetailsRex Boyles
Rooms 207, 208, 209, 307, 308, 309, 310, 407, 408, 409, 410

Wall rough in Phone #: ###-#### Inspection requested via web by Tom Betty r/i walls ok
Electrical Rough-In11/24/201511/24/201511/24/2015APASS
DetailsRex Boyles
Rm 402, 403 Wall inspection Phone #: ###-#### Inspection requested via web by Tom Betty r/i elect, rm and data rm ok
Electrical Rough-In11/2/201511/2/201511/2/2015APASS
DetailsRex Boyles
Rms 302, 303 Rough In - Call for Wayne Phone #: ###-#### Inspection requested via web by Tom Betty r/i walls ok SWHQ
Electrical Rough-In10/12/201510/13/201510/13/2015APASS
DetailsRex Boyles
SHQ Lvl 6 Z 1,2,3
Room 202,203,210 Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok level 6 zone 2 and 3 (100% on slab on deck complete for all levels. r/i walls ok in rms. 202,203 and 210