Permit Information
Permit NumberELE16-01946
StatusFinaled
Name ENERGY ENTERPRISE GROUP LLC
Site Address 918 W IDAHO ST
Project NameAthlos Headquarters - Phase 2
Customer Number609
ePlanReviewNo
Description
Alteration: Electrical for Remodel
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/26/20176/26/20176/26/2017PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Final ok
Final6/22/20176/23/20176/23/2017AFAIL
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Test buttons on exterior FR. egress lighting. 3rd floor- All floors move disconnecting means with in 6'7" of floor for furnaces.
300.15- Open boxes shall have covers. old Sw in HVAC room.
Exit box east stair.
MEZZ- 210.8- GFCI receptacle with in 6' of janitors basin.
Covers for gutter and recept in data room.
Mech. terminate MC in a box.
Center class room exit missing.
1st floor- add show window receptacles for 20' of window length.
Check manufacturers instruction for heater mounted face down at ceilings.
Dead receptacles and covers in server rm.
Parking garage- Cover or remove old boxes in pillars where wir is present.
Open ceilling box.
Cover recept in mech under control.
GFCI all garage receptacles.

Electrical Rough-In5/11/20175/11/20175/11/2017PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Mezz grid rough in ok cover
Final5/4/20175/4/20175/4/2017PPART
DetailsRock A. Hudson
PARTIAL FINAL ON 2ND FLOOR Phone #: ###-#### Inspection requested via web by Kerri Hamilton
2nd floor complete, furniture, offices noted complete. 2nd TCO OK
Final4/4/20174/4/20174/4/2017APART
DetailsDaryl DeGrange
Elevator Electrical Final Inspection, Pass
Final3/28/20173/28/20173/28/2017PPART
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Bottom of stairways finishes not on but boxes safed off. Perimeter of building not ready. Floor 2 areas not finished to be locked to public. 208, 215, 224, 229 not ready rest ok. TCO for 2nd and 4th floors only ok
Final3/22/20173/23/20173/23/2017AFAIL
DetailsRock A. Hudson
Partial Final Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Needs temp occupancy for 2nd and 4th floors. Egress lighting not complete.
210.8- GFCI protection for all receptacle outlets located 6' of sink. Both janitor basin
110.3- Outdoor receptacles not working 2 east and 1 west.
300.4-Heat trace cable shall be protected from physical damage where exposed to public in stairways and decks.
210.23(B)- 50 amp receptacles installed on 30 amp circuits for dryers on 2nd and 4th flloors.
Electrical Rough-In2/16/20172/17/20172/17/2017PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Graham Estep
Additional 1st floor walls rough in ok cover
Conference2/17/20172/17/20172/17/2017PDONE
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Graham Estep
Discussed exposed MC cable below beams 1st floor and fire pump wiring.
330.12(1)- MC cable shall not be ran exposed to physical damage. Areas from floor to 8' are exposed to physical damage as per 300.5(D)(1). MC shall be enclosed in soffit for protection. I was able to grab standing on floor.
695.4(B)(2)- Individual sources of power. Overcurent device shall carry indefinitely the sum of locked rotor current of fire pump. Fire pump controller rated 25 hp with 25 hp pump. Mian breaker states may not trip until 1500 amp load reached.
Electrical Rough-In2/3/20172/6/20172/6/2017APASS
DetailsRock A. Hudson
Above ceiling rough in for 1st and 2nd floors. Phil is the site contact. Thanks
Phone #: ###-#### Inspection requested via web by Graham Estep
1st floor hard lid N.W. corner and 2nd floor grid as noted on print rough in ok cover
Electrical Rough-In1/19/20171/20/20171/20/2017APASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
1st floor men's and women's bath and locker room hardlids.
2nd floor grid and wall pop outs as noted on contractor print rough in ok cover
Electrical Rough-In1/4/20171/4/20171/4/2017PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Break room hardlid rough in ok cover
Electrical Rough-In12/22/201612/22/201612/22/2016PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
1st floor and mezz walls as noted on contractor print rough in ok cover
Electrical Rough-In12/8/201612/8/201612/8/2016PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Ramp ceiling and walls on mezz as marked on print rough in ok cover.
Permanent Service11/30/201612/1/201612/1/2016APASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
p/s u/g n ok
Electrical Rough-In11/29/201611/30/201611/30/2016PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Basement walls added after gear installed. Rough in ok cover
Permanent Service11/29/201611/30/201611/30/2016PFAIL
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
110.24- Available fault current shall be posted prior to permanent service inspection.
Electrical Rough-In11/9/201611/9/201611/9/2016APASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Discussed required grounding electrode system and conductor needed. 3000 amp service with multiple sets of service entrance conductors exceeding 1100 kcmil copper or 1750 aluminum so 3/0 needed. A single undergound water pipe shall be supplemented by additional pipe or rod. 2 underground water pipe systems present. No other grounding electrodes described in 250.52 present.
1st floor wall rough in as noted on contractor print rough in ok cover
Electrical Rough-In10/26/201610/26/201610/26/2016PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Ceiling in basement, east gym wall, framed wall in west stair as noted on contractor print rough in ok cover.
Electrical Rough-In10/11/201610/11/201610/11/2016PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Basement storage walls and ceilings, 2nd floor soffits all as noted on contractor print.
Electrical Rough-In10/3/201610/4/201610/4/2016PPASS
DetailsRock A. Hudson
Basement Ceiling Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Part of parking garage ceiling as noted on contractor print rough in ok cover
Electrical Rough-In9/29/20169/29/20169/29/2016PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Small area 1 sided with drywall prior to inspection told this is your 1 allowed. Future cover prior to inspection will be red tagged for removal.
Areas noted on contractor print walls and bath foyer wall and hardlid rough in ok cover
Conference9/29/20169/29/20169/29/2016PDONE
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Discussed the installation requirements for service entrance conductors to run down the outside of a building than enter an exterior wall directly into a listed fire pump controller on interior of fire pump room. 695.6(A)(1)- Service conductors for fire pump shall be physically routed outside and building and shall be installed as service entrance conductors in accordance with 230.6. Asked contractor to discuss with fire marshal if protection from traffic is needed with outside conduit is to run on outside of wall in alley behind building.
Electrical Rough-In9/14/20169/15/20169/15/2016PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
2nd floor N. E. offices and bath foyer, electrical room walls, 3rd floor electrical room walls rough in ok cover. Also discussed again minimum work clearance for HVAC control panels on units. A reduction in work clearance has been made for old buildings and framing issues to 18" deep and 30" wide minimum. These measurements will be strictly enforced.
Electrical Rough-In9/8/20169/9/20169/9/2016APASS
DetailsRock A. Hudson
Please call 20 minutes prior. Thanks Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Bathroom walls and hardlids for floors Mezz., 2nd, and 3rd rough in ok cover.
Basement parking garage ceiling ok to insulate and hat channel ok.
Electrical Rough-In8/23/20168/24/20168/24/2016PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Walls on 2nd floor as noted on contractor print rough in ok cover
Electrical Rough-In8/16/20168/17/20168/17/2016APASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton West offices and a few SW offices ok for cover as noted on contractor print.
Conference8/10/20168/10/20168/10/2016PDONE
DetailsRock A. Hudson
Please call 30 minutes prior. Thank you Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Discussed access to HVAC disconnect in basement. Have plumbing pipes moved to provide as much work space as possible.
Electrical Rough-In8/5/20168/8/20168/8/2016PPASS
DetailsRock A. Hudson
4th Floor Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Discussed with Electrical and Plumbing foreman the required work space to control junction box of HVAC unit in ceiling areas. As per Daryl DeGrange must have at least 18" depth access to these areas.
Level 4 wall rough in ok cover
Conference7/26/20167/27/20167/27/2016ADONE
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Discussed work clearence for HVAC units in ceiling areas. Piping that has been installed limits access to control box on units. 110.26 requires 36" however where not possible less OK. Shall not be less than 18" clear access.
Conference6/21/20166/21/20166/21/2016PDONE
DetailsRock A. Hudson
Please call 30 minutes prior Phone #: ###-#### Inspection requested via web by Kerri Hamilton Discussed the location of fire pump at an interior room. This pump shown supplied by seperate service. As per 230.6(2) service entrance conductors shall be concidered outside building, when run inside building it shall be encased by min of 2" of concrete or brick.