Final | 9/12/2016 | 9/12/2016 | 9/12/2016 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Louis Keller pool final ok
|
Electrical Rough-In | 7/14/2016 | 7/15/2016 | 7/15/2016 | A | PASS |
Eric Story
|
|
|
Equal Potential Plane, Potting ; Bonding Inspection Phone #: ###-#### Inspection requested via web by Louis Keller equipotential bonding around perimeter of pool and shell of pool and cover ok cover
|
Electrical Rough-In | 7/6/2016 | 7/7/2016 | 7/7/2016 | A | PASS |
Eric Story
|
|
|
Cover Up Inspection Phone #: ###-#### Inspection requested via web by Louis Keller underground for pool ok cover
|
Electrical Rough-In | 6/23/2016 | 6/24/2016 | 6/24/2016 | A | PASS |
Eric Story
|
|
|
Bonding Inspection Phone #: ###-#### Inspection requested via web by Louis Keller All four corners and pool light and diving board bonding ok cover
|