Final | 6/28/2016 | 6/28/2016 | 6/28/2016 | P | PASS |
Eric Story
|
|
|
Call Clint for access code if locked. Phone #: ###-#### Inspection requested via web by Clint Tate final ok
|
Electrical Rough-In | 6/24/2016 | 6/24/2016 | 6/24/2016 | P | PASS |
Eric Story
|
|
|
We are requesting a rough-in inspection for today. Please call Dave w/ Buckshot Construction to get in the bldg. ###-####. Thank you Phone #: ###-#### Inspection requested via web by Clint Tate room to the left wall ok cover
|