Final | 9/15/2016 | 9/16/2016 | 9/16/2016 | P | PASS |
James Ady
|
|
|
Call when in route if possible; obtain visitors badge from front desk. Phone #: ###-#### Inspection requested via web by Steve McCloy Final ok
|
Final | 8/1/2016 | 8/2/2016 | 8/2/2016 | A | CANC |
Bob Reichert
|
|
|
Call Steve when in route if possible; obtain visitors pass from front desk Phone #: ###-#### Inspection requested via web by Steve McCloy contractor asked to cancel
|
Electrical Rough-In | 7/29/2016 | 8/2/2016 | 8/2/2016 | A | PASS |
Bob Reichert
|
|
|
Call Steve when in route; obtain visitors badge from front desk. Phone #: ###-#### Inspection requested via web by Steve McCloy ok cover ceiling 1st floor north part west hall
|
Electrical Rough-In | 6/30/2016 | 6/30/2016 | 7/5/2016 | A | PASS |
Bob Reichert
|
|
|
Rough in inspection copied from ELE15-04115. Patriot mistakingly pulled one ELE for two seperate projects. The Rough In inspection called in under ELE15-04115 is for this projects scope of work per inspector 370 & contractor
|