Final | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | PASS |
Tom Saunders
|
|
|
electrical final on pool Phone #: ###-#### Inspection requested via web by Kevin Koomler
ok to final
|
Electrical Rough-In | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | PASS |
Eric Story
|
|
|
Kevin Phone #: ###-####
bonding grid around perimeter ok to cover
|
Electrical Rough-In | 7/20/2016 | 7/21/2016 | 7/21/2016 | A | PASS |
Bob Reichert
|
|
|
Underground cover Phone #: ###-#### Inspection requested via web by Kevin Koomler ok cover u/g for pool
|
Electrical Rough-In | 7/5/2016 | 7/6/2016 | 7/6/2016 | A | PASS |
Eric Story
|
|
|
pool bonding 4corners cover motor 1ea light Phone #: ###-#### Inspection requested via web by Kevin Koomler all four corners and railing and light pool bonding ok cover
|