Final | 12/11/2017 | 12/12/2017 | 12/12/2017 | A | PASS |
Eric Story
|
|
|
Lee Phone #: ###-#### Final for x-ray area and conveyor area ok
|
Electrical Rough-In | 9/6/2017 | 9/6/2017 | 9/6/2017 | P | PASS |
Eric Story
|
|
|
Lee Phone #: ###-#### Ceilings in phase 2 ok cover
|
Electrical Rough-In | 7/28/2017 | 7/31/2017 | 7/31/2017 | A | PASS |
Eric Story
|
|
|
Lee Phone #: ###-#### Walls only phase 2 ok cover
|
Final | 5/9/2017 | 5/10/2017 | 5/10/2017 | A | PASS |
Eric Story
|
|
|
Lee Phone #: ###-#### Final ok
|
Electrical Rough-In | 3/13/2017 | 3/14/2017 | 3/14/2017 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### SBRA room grid rough in ok cover
|
Electrical Rough-In | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | PASS |
Eric Story
|
|
|
Lee Phone #: ###-#### Under conveyor areas ok cover
|
Conference | 9/9/2016 | 9/12/2016 | 9/12/2016 | A | DONE |
James Ady
|
|
|
Lee Munoz is contact at the ariprot Phone #: ###-#### Allowing SO cord between Disconnect and Xray machine
|