Final | 5/16/2017 | 5/16/2017 | 5/16/2017 | P | PASS |
Tom Saunders
|
|
|
Final Phone #: ###-#### Inspection requested via web by Derek Newton...
ok to final
|
Electrical Rough-In | 10/21/2016 | 10/21/2016 | 10/21/2016 | P | PASS |
Tom Saunders
|
|
|
This is the second phase of the rough-in inspection after the roof was closed. This inspection is for the new electrical wiring in the garage and power room before the drywall goes up. Phone #: ###-#### Inspection requested via web by Derek Newton....
garage and pwdr room approved for cover...verify washer outlet on seperate circuit and gfi protected and readily accessible-in garage-at final
|
Rough-In Permanent Service | 8/4/2016 | 8/4/2016 | 8/4/2016 | P | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Derek Newton need to check for bushings in meter and panel on final/ Rough-in ok cover p/s o/h rec ok
|
Conference | 7/17/2016 | 7/18/2016 | 7/18/2016 | A | DONE |
Eric Story
|
|
|
Initial conference with inspector before work to go over project. Phone #: ###-#### Inspection requested via web by Derek Newton discussed code requirments for refeeding circuits in house and requirements for service change if idaho power will uprade to 200 amp
|