Final | 11/9/2016 | 11/14/2016 | 11/14/2016 | A | PASS |
James Ady
|
|
|
After 9 am if possible. Phone #: ###-#### Inspection requested via web by Jon Lindberg Final ok
|
Electrical Rough-In | 10/4/2016 | 10/4/2016 | 10/4/2016 | P | PASS |
James Ady
|
|
|
Please verify exterior light blocks meet requirements. Siding going on today. Phone #: ###-#### Inspection requested via web by Jon Lindberg Light boxes ok
|
Electrical Rough-In | 9/29/2016 | 9/30/2016 | 9/30/2016 | P | PASS |
James Ady
|
|
|
After 2 preferred. Kiln/220 plug rough in. Call cell if before 2. Phone #: ###-#### Inspection requested via web by Jon Lindberg Rough in ok
|
Electrical Rough-In | 8/9/2016 | 8/9/2016 | 8/9/2016 | P | PASS |
James Ady
|
|
|
Jon Phone #: ###-#### rough in ok to cover
|
Conference | 8/8/2016 | 8/8/2016 | 8/8/2016 | P | DONE |
James Ady
|
|
|
Jon Phone #: ###-#### Spoke about junction boxes being accessable,need for nail plates, and inspection requests
|
Conference | 8/3/2016 | 8/4/2016 | 8/4/2016 | A | DONE |
James Ady
|
|
|
Jon Phone #: ###-#### Spoke about wire support surface mounted coduit requirements Minnimum conductor lenth in box
|
Conference | 7/19/2016 | 7/20/2016 | 7/20/2016 | P | DONE |
Rock A. Hudson
|
|
|
Jon Phone #: ###-#### Discussed the wiring for garage addition. Free 6" conductor, 1 1/4" on bored holes and securing NM cable, NM support, tamper resistant receptacles, wire size for sub panel, GFCI protection.
|