Final | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | PASS |
Mark Moncarr
|
|
|
Pete Phone #: ###-#### final ok
|
Final | 11/18/2016 | 11/21/2016 | 11/21/2016 | A | NR |
Mark Moncarr
|
|
|
Pete Phone #: ###-####
|
Electrical Rough-In | 9/22/2016 | 9/23/2016 | 9/23/2016 | P | PASS |
Mark Moncarr
|
|
|
Pete Phone #: ###-#### ok cover
|
Electrical Rough-In | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | FAIL |
Mark Moncarr
|
|
|
Pete Phone #: ###-#### tyype R2 stucture needs wired according to 210.60 and 210.52 (A)and (D). Multiple box fill locations, stackits needs used in various locations, range boxes need changed out to accomodate for 8/3 romex, all boxes need made up to show grounds tied through.
|
Electrical Rough-In | 7/25/2016 | 7/25/2016 | 7/25/2016 | P | PASS |
Eric Story
|
|
|
Pete-underground Phone #: ###-#### underground for feeds ok cover
|