ELE-Request for Extension | 8/11/2020 | 8/11/2020 | 8/11/2020 | A | PASS |
Daryl DeGrange
|
|
|
Mr. Seeliger has requested a third and final permit extension to complete his project. Extension ok
|
ELE-Aging Inspection | 8/6/2020 | 8/6/2020 | 8/6/2020 | | PEND |
Daryl DeGrange
|
|
|
This permit is still open with the City of Boise. please call 208 ###-#### with a progress report or any questions. If your job is complete, or schedule an final inspection online. Thank you!
|
ELE-Aging Inspection | 5/7/2020 | 5/7/2020 | 5/7/2020 | | DONE |
Daryl DeGrange
|
|
|
Sill under construction
|
ELE-Aging Inspection | 2/6/2020 | 2/6/2020 | 2/6/2020 | | DONE |
Mark Moncarr
|
|
|
2 requests for electrical extensions have been made. 1 more extension will be allowed. If an extension is needed, please call and request extension for work being done.
|
ELE-Aging Inspection | 11/7/2019 | 11/7/2019 | 11/7/2019 | | DONE |
Mark Moncarr
|
|
|
Please call the city and request an extension for permit on work being done.
|
Electrical Rough-In | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | PASS |
Mark Moncarr
|
|
|
Wayne ###-#### Ok cover. Nail plates completed.
|
Final | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | CANC |
Mark Moncarr
|
|
|
Phone #: 2088606259 >> Inspection requested via mobile web by Wayne Seeliger Should have been a RI for completing nail plates.
|
ELE-Aging Inspection | 6/21/2019 | 6/21/2019 | 6/21/2019 | | DONE |
Mark Moncarr
|
|
|
Extension was given by Daryl DeGrange on 3/22/19
|
ELE-Request for Extension | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Daryl DeGrange
|
|
|
Mr. Seeliger has requested an Extension to complete his project. Extension ok
|
ELE-Aging Inspection | 3/12/2019 | 3/12/2019 | 3/14/2019 | | DONE |
Mark Moncarr
|
|
|
Left message on Mar 14 asking for status on job. Please return phone call.
|
Electrical Rough-In | 1/18/2018 | 1/19/2018 | 1/19/2018 | A | PASS |
Mark Moncarr
|
|
|
Wayne Phone #: ###-#### Ok cover. Homeowner used 12 and 14 romex. I told him that brkr size upon final needed to be no more than a 15a brkr.
|
Electrical Rough-In | 11/16/2017 | 11/16/2017 | 11/16/2017 | P | PASS |
Mark Moncarr
|
|
|
wayne Phone #: ###-#### Ok cover garage only.
|
Conference | 8/9/2017 | 8/9/2017 | 8/9/2017 | P | DONE |
Mark Moncarr
|
|
|
wayne Phone #: ###-#### Discussed grounding in panel, GFI protection for door openers, polaris taps needed for junction in crawl space.
|
Electrical Rough-In | 6/1/2017 | 6/2/2017 | 6/2/2017 | A | PASS |
Mark Moncarr
|
|
|
Wayne-underground conduit Phone #: ###-#### Ok cover trench. Depth is 24"
|
ELE-Request for Extension | 3/10/2017 | 3/13/2017 | 3/13/2017 | A | DONE |
Mark Moncarr
|
|
|
Wayne Phone #: ###-#### Talked to Wayne, he is going to call in to permit techs and request an electrical extension.
|