Final | 10/10/2016 | 10/10/2016 | 10/10/2016 | P | PASS |
Eric Story
|
|
|
Dave Phone #: ###-#### Final for detached building ok
|
Electrical Rough-In | 8/3/2016 | 8/4/2016 | 8/4/2016 | A | PASS |
Eric Story
|
|
|
Cheryl Phone #: ###-#### out buildings ok cover
|
Electrical Rough-In | 8/1/2016 | 8/2/2016 | 8/2/2016 | P | CANC |
Eric Story
|
|
|
Cheryl or Dave ###-#### Phone #: ###-####-7209 needed conference
|
Conference | 8/2/2016 | 8/2/2016 | 8/2/2016 | P | DONE |
Eric Story
|
|
|
Cheryl or Dave ###-#### Phone #: ###-####-7209 Discussed removing sheetrock where wiring was done for nailplating, also establishing grounding electrode conductors for seperate building,sch 80 or emt for riser. wiring did look pretty good from what was removed.
|