Final | 9/30/2016 | 10/3/2016 | 10/3/2016 | A | PASS |
Mark Moncarr
|
|
|
electrical final on swimming pool Phone #: ###-#### Inspection requested via web by Kevin Koomler final ok
|
Electrical Rough-In | 9/1/2016 | 9/2/2016 | 9/2/2016 | P | PASS |
Mark Moncarr
|
|
|
equal potential; Kevin Phone #: ###-#### equipotential ok
|
Electrical Rough-In | 8/18/2016 | 8/19/2016 | 8/19/2016 | P | PASS |
Bob Reichert
|
|
|
Underground cover // Kevin Phone #: ###-#### ok cover u/g
|
Electrical Rough-In | 8/3/2016 | 8/4/2016 | 8/4/2016 | A | PASS |
Bob Reichert
|
|
|
Bonding inspection // Kevin Phone #: ###-#### corrections made, pool bonding at 4 corners and skimmer ok
|
Electrical Rough-In | 8/2/2016 | 8/3/2016 | 8/3/2016 | P | NR |
Bob Reichert
|
|
|
pool bonding 4 corners cover skimmer Phone #: ###-#### Inspection requested via web by Kevin Koomler called, clamps for grounding not suited for purpose or installed correctly
|