Final | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | PASS |
Tom Saunders
|
|
|
Give me a call/text when on your way. This could be a final if we get all the lables. Phone #: ###-#### Inspection requested via web by Kevin Cowgill
no corrections needed....ok to final
|
Rough-In Permanent Service | 9/21/2016 | 9/23/2016 | 9/23/2016 | P | PASS |
Tom Saunders
|
|
|
Give me a call/text when on your way. This could be a final if we get all the lables. Phone #: ###-#### Inspection requested via web by Kevin Cowgill
all labeling correct, grounding and bonding, correct, listing correct
p/s solar n ok
|
Electrical Rough-In | 8/29/2016 | 8/29/2016 | 8/29/2016 | P | PASS |
Eric Story
|
|
|
Kevin-underground to cover Phone #: ###-#### underground from solar panels ok cover
|
Conference | 8/2/2016 | 8/3/2016 | 8/3/2016 | P | DONE |
Eric Story
|
|
|
Please call/text about 30 minutes before you get there so I can meet you to discuss project. If at all possible, before or after 2:30-3pm, as owner will not be available. Thanks! Phone #: ###-#### Inspection requested via web by Kevin Cowgill discussed pole mounted solar array and grounding/disconnecting means at the house and at solar array
|