Final | 8/31/2016 | 9/1/2016 | 9/1/2016 | A | PASS |
Bob Reichert
|
|
|
P;ease call Jason at ###-#### in route for access. Phone #: ###-#### Inspection requested via web by Kelly Felin ok final
|
Electrical Rough-In | 8/3/2016 | 8/5/2016 | 8/5/2016 | A | PART |
Rock A. Hudson
|
|
|
ready for rough. supposed to be open. Phone #: ###-#### Inspection requested via web by Kelly Felin Receptacle added for hospital bed location in bed room. 2 boxes located over tub area junction points only and shall have nonmetallic cover wet location rated. Bathroom rough in ok cover
|