Final | 10/25/2016 | 10/25/2016 | 10/25/2016 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Hidajet Zahic....
ok to final this permit....future permit wiil need pulled for hot tub installation and permit for bonus room to be finished....at final hot tub circuit has disconnect installed with GFI breaker in it....bonus room at time of final has a light, smoke detector, outlet in future bath, and one GFI outlet installed....all other openings have been safed off and blanks installed....approved Daryl Degrange
|
Rough-In Permanent Service | 8/30/2016 | 8/31/2016 | 8/31/2016 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Hidajet Zahic rough-in ok cover p/s u/g n ok
|