Final | 9/14/2016 | 9/15/2016 | 9/15/2016 | A | PASS |
James Ady
|
|
|
please call prior to arrival for access information. Phone #: ###-#### Inspection requested via web by Patrick Paz Final ok
|
Electrical Rough-In | 8/11/2016 | 8/12/2016 | 8/12/2016 | P | PASS |
Bob Reichert
|
|
|
floor heat inspection Phone #: ###-#### Inspection requested via web by Patrick Paz ok cover floor heat, see ri card
|
Electrical Rough-In | 8/10/2016 | 8/11/2016 | 8/11/2016 | P | NR |
Bob Reichert
|
|
|
floor heat inspection. Phone #: ###-#### Inspection requested via web by Patrick Paz still installing floor heat
|
Electrical Rough-In | 8/5/2016 | 8/5/2016 | 8/5/2016 | A | PASS |
Bob Reichert
|
|
|
Master bath remodel / floor heat circuit Phone #: ###-#### Inspection requested via web by Patrick Paz bath ri ok
|