Information based on query as of Thursday, June 20, 2024.
Permit Information
Permit NumberELE16-02600
StatusFinaled
Name R M E INC
Site Address 500 S CAPITOL BLVD
Project Name 
Customer Number 
ePlanReviewNo
Description
New: Above ground electrical for Inn at 500 shell and core with interior buildout.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/13/20177/14/20177/14/2017APASS
DetailsEric Story
Randy. Phone #: ###-#### Inspection requested via web by Sean DeLacy
Final ok
Final2/10/20172/10/20172/10/2017PPART
DetailsEric Story
Check penthouse #2 for AFCI protection and undercounter lighting whip
6th floor correction fixed on penthouse 2, combined all lighting circuits on one AFCI breaker. All units in 6th floor now ok occupy
Electrical Rough-In2/9/20172/10/20172/10/2017AFAIL
DetailsEric Story
Matt. Penthouse final. Phone #: ###-#### Inspection requested via web by Sean DeLacy
AFCI protection for bedroom and undercounter whip in kitchen
Electrical Rough-In2/7/20172/8/20172/8/2017PCANC
DetailsEric Story
Matt. 6th floor capitol units final. Phone #: ###-#### Inspection requested via web by Sean DeLacy
Needed partial final for 6th floor
Final2/8/20172/8/20172/8/2017PPART
DetailsEric Story
Matt. 6th floor capitol units final. Phone #: ###-#### Inspection requested via web by Sean DeLacy
6th floor remaining rooms minus penthouse 1@2@3 ok occupie
Permanent Service2/6/20172/6/20172/6/2017PCANC
DetailsEric Story
Matt. Meyers Pedestal. Phone #: ###-#### Inspection requested via web by Sean DeLacy
Need a seperate permit for different service
Electrical Rough-In2/2/20172/3/20172/3/2017PCANC
DetailsEric Story
Matt. Final on 6th floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy
Needed partial for 6th floor
Final2/3/20172/3/20172/3/2017PPART
DetailsEric Story
Matt. Final on 6th floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy
6th floor Myrtle side only minus penthouse 3 ok to occupy
Electrical Rough-In1/20/20171/20/20171/20/2017PCANC
DetailsEric Story
Matt. Final on 5th Floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy
needed temp oc
Final1/20/20171/20/20171/20/2017PPART
DetailsEric Story
Matt. Final on 5th Floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy
All of 5th floor ok will need to check 513 for receptacle to be added in bath
Electrical Rough-In1/13/20171/13/20171/13/2017PPASS
DetailsEric Story
Please come close to 12:00 if possible. Level 6 penthouses, level 4, and level 2/3 bathroom re-inspection. Matt Mouser is the onsite contact. Phone #: ###-#### Inspection requested via web by Buster Bowen
6th floor penthouses walls and hard lids ok cover
Final1/13/20171/13/20171/13/2017PPART
DetailsEric Story
Please come close to 12:00 if possible. Level 6 penthouses, level 4, and level 2/3 bathroom re-inspection. Matt Mouser is the onsite contact. Phone #: ###-#### Inspection requested via web by Buster Bowen
FLoors 1 thru 4 temp occ only ok(verified corrections in baths and remaining light boxes and type mc whips safe ended)
Electrical Rough-In1/9/20171/10/20171/10/2017PFAIL
DetailsEric Story
Matt. Final on floor 4. Phone #: ###-#### Inspection requested via web by Sean DeLacy
415,417 had open wires-402,403,413 units in-op-all receptacles abve f/p for tv's were not tamper resistant nor were all bathrooms and within 6' of sinks in floors 2,3,4-storage rooms and file rooms not ready
Electrical Rough-In1/4/20171/5/20171/5/2017PPASS
DetailsRock A. Hudson
Matt. Level 6 corridor and remaining units rough in. Final for level 3. Phone #: ###-#### Inspection requested via web by Sean DeLacy
3rd floor rooms 301 open boxes, 302, 303, 304, 305, 307, 309, 310, 312, 313 add recept for 2nd bath vanity, 314, 316, 317, 318, 319, 322, 323, 325, 327, 329, 331. Rooms without notes ok occupy.
6th floor rooms 605, 60, 69, 610 and capitol corridor hardlid rough in ok cover.
Electrical Rough-In12/27/201612/28/201612/28/2016PPASS
DetailsEric Story
Matt. Level 6 corridor. Phone #: ###-#### Inspection requested via web by Sean DeLacy
6th floor on myrtle side corridor hard lids ok cover
Electrical Rough-In12/20/201612/21/201612/21/2016PPASS
DetailsRock A. Hudson
Matt. Level 6 elevator lobby. Phone #: ###-#### Inspection requested via web by Sean DeLacy
Area noted and walls and hardlids for rooms 611, 613, 614 rough in ok cover
Final12/15/201612/16/201612/16/2016PPART
DetailsEric Story
Matt. Partial TO final on floors 1 ; 2. Phone #: ###-#### Inspection requested via web by Sean DeLacy
Lobby and office areas are ok to train, 2nd floor corridor and laundry area ok. Rooms on east wing checed out ok, east wing other then fitness room ok
Final12/14/201612/15/201612/15/2016AFAIL
DetailsEric Story
Dave. Partial final floors 1 ; 2. Phone #: ###-#### Inspection requested via web by Sean DeLacy
Shall blank all unused or not hung light fixtures@remove all temp cords from areas as needed
BCO 4-05-32 It shall be unlawful to cover or conceal electrical equipment from inspection or installation, remove furniture or equipment from walls as needed
All LV shall be blank off or installed
GFCI protection for equipment shall be readily accessible.
Electrical Rough-In12/13/201612/13/201612/13/2016PPASS
DetailsEric Story
Dave. Garage inspection ; 6th floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy
Areas an noted on inspection logbook ok cover
Electrical Rough-In12/8/201612/8/201612/8/2016PPASS
DetailsRock A. Hudson
Garage Ceiling cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy
Garage hard lid to "T" and rooms 618, 622, 626, 627, 630 rough in ok cover.
Electrical Rough-In12/5/201612/6/201612/6/2016APASS
DetailsEric Story
Garage and misc ceilings for early AM
Garage ceilings to 3rd column and 2 floor offices and misc rooms as noted ok cover
Electrical Rough-In12/5/201612/5/201612/5/2016PNR
DetailsEric Story
Dave. Garage ceiling cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy
Not ready
Electrical Rough-In11/28/201611/29/201611/29/2016APASS
DetailsEric Story
Dave. 5th floor capitol corridor. Phone #: ###-#### Inspection requested via web by Sean DeLacy
5th floor capitol blvd corridor hard lids ok cover
Electrical Rough-In11/22/201611/22/201611/22/2016PPASS
DetailsEric Story
6th floor cover. Dave onsite Phone #: ###-#### Inspection requested via web by Buster Bowen
Ares noted on on inspection record 5th floor rooms and 6th floor demizing walls on myrtle side ok cover
Electrical Rough-In11/16/201611/16/201611/16/2016APASS
DetailsEric Story
Dave. Phone #: ###-#### Inspection requested via web by Sean DeLacy
5th floor myrtle side corrridor hard lid only ok cover and as noted on inspection record
Electrical Rough-In11/11/201611/14/201611/14/2016APASS
DetailsEric Story
Dave. Phone #: ###-#### Inspection requested via web by Sean DeLacy
room 503 ok cover
Electrical Rough-In11/11/201611/14/201611/14/2016APASS
DetailsEric Story
Dave. Phone #: ###-#### Inspection requested via web by Sean DeLacy
Room 503 ok cover
Electrical Rough-In11/9/201611/10/201611/10/2016APASS
DetailsEric Story
Dave. Floor 5 ; 6. Phone #: ###-#### Inspection requested via web by Sean DeLacy
Areas as noted on inspection record ok cover 5th and 6th floor
Electrical Rough-In11/4/201611/4/201611/4/2016APASS
DetailsEric Story
Dave. 4th floor corridor. Phone #: ###-#### Inspection requested via web by Sean DeLacy
4th floor hardlids in corridor and remaining rooms on 4th floor walls and two rooms on 5th floor as marked on inspection record ok cover
Electrical Rough-In11/2/201611/2/201611/2/2016PPASS
DetailsEric Story
Dave. 4th floor cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy
Floors 4@5 as noted on inspection record ok cover
Electrical Rough-In10/27/201610/27/201610/27/2016APASS
DetailsJames Ady
Dave. 4th floor wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy 4th floor walls only and 6th floor corridor Ceiling only As marked on print. ok to cover
Electrical Rough-In10/21/201610/21/201610/21/2016PPASS
DetailsEric Story
Dave. Wall cover 5th floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy
5th floor walls as marked on record only ok cover
Electrical Rough-In10/18/201610/19/201610/19/2016APASS
DetailsEric Story
Dave. Phone #: ###-#### Inspection requested via web by Sean DeLacy
6th floor hard lids and 4th floor rooms as noted ok cover
Electrical Rough-In10/14/201610/17/201610/17/2016APASS
DetailsEric Story
4th Floor wall cover capital side. Phone #: ###-#### Inspection requested via web by Sean DeLacy
3rd floor corridor on myrtle side only/4th floor as marked on inspection record ok cover
Electrical Rough-In10/13/201610/13/201610/13/2016PPASS
DetailsJames Ady
Dave. 5th floor ceiling Capitol side of building. Phone #: ###-#### Inspection requested via web by Sean DeLacy 5th floor ceiling only ok to cover
Electrical Rough-In10/13/201610/13/201610/13/2016PCANC
DetailsJames Ady
Dave. 5th floor ceiling Capitol side of building. Phone #: ###-#### Inspection requested via web by Sean DeLacy Duplicate inspection request
Electrical Rough-In10/10/201610/11/201610/11/2016APASS
DetailsEric Story
Dave 5th floor exterior wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy
5th floor exterior walls and 2nd floor elevator ceiling as noted on inspection record ok cover
Electrical Rough-In10/6/201610/7/201610/7/2016APASS
DetailsEric Story
2nd Floor common are ceiling cover. Dave is the onsite contact. Phone #: ###-#### Inspection requested via web by Buster Bowen
2nd floor corridor hard lids and 3rd floor rooms as noted on record ok cover
Conference10/4/201610/4/201610/4/2016PPASS
DetailsEric Story
Dave is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen
EC has cans above shower stalls and was needing to know what kind of trim was needed
Permanent Service10/4/201610/4/201610/4/2016PPASS
DetailsEric Story
Dave is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen
p/s u/g n ok
Electrical Rough-In10/4/201610/4/201610/4/2016PPASS
DetailsEric Story
Dave is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen
3rd floor fireplace walls and headboard and bath walls and hard lids as noted on print ok
Electrical Rough-In9/29/20169/30/20169/30/2016APASS
DetailsEric Story
Dave. 3rd floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy
3rd floor south units walls for fireplace and headboard walls and bath hard lids as noted on inspection record ok cover
Electrical Rough-In9/26/20169/27/20169/27/2016ACANC
DetailsEric Story
Dave. 3rd floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy
duplicate inspection called in
Electrical Rough-In9/26/20169/27/20169/27/2016APASS
DetailsEric Story
Dave. 3rd floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy
3rd floor rooms noted on print bathroom hardlids,f/p and headboard walls ok cover
Electrical Rough-In9/22/20169/22/20169/22/2016PPASS
DetailsEric Story
Dave. Rough in floors 3-4. Phone #: ###-#### Inspection requested via web by Sean DeLacy
units 302,304 interior walls as noted only, 310 west wall and bath hard lid,415,421,423,425,429 interior walls as noted and storage walls only ok cover
Electrical Rough-In9/14/20169/14/20169/14/2016PPASS
DetailsEric Story
Dave. 2nd floor laundry room. Phone #: ###-#### Inspection requested via web by Sean DeLacy
2nd floor laundry walls ok cover. Also discussed cut out in top of main gear and EC will provide abrasion protection around edges for wires.
Electrical Rough-In9/12/20169/12/20169/12/2016APASS
DetailsEric Story
Dave. Floor 2 ; 3. Phone #: ###-#### Inspection requested via web by Sean DeLacy
2nd and 3rd floor as noted on inspection record ok cover
Electrical Rough-In9/12/20169/12/20169/12/2016APASS
DetailsEric Story
Dave. Floor 2 ; 3. Phone #: ###-#### Inspection requested via web by Sean DeLacy
2nd and 3rd floor as noted on inspection record ok cover
Conference9/8/20169/9/20169/9/2016ADONE
DetailsEric Story
Meet for room receptacles designations at 200 Broad st. 9am
Discussed layout of receptacles in all floor plans, will go by print for readily accessible layout for furniture and accesibility of receptacles.
Conference9/8/20169/9/20169/9/2016ADONE
DetailsRock A. Hudson
Meeting for room receptacle designation at 200 Broad st. 9am
Discussed receptacle layouts in each floor plan and noted on prints to be forewarded to contractor on site.
Final9/8/20169/9/20169/8/2016ACANC
DetailsRock A. Hudson
Meeting for room receptacle designation at 200 Broad st. 9am Needed conference
Electrical Rough-In9/8/20169/8/20169/8/2016PCANC
DetailsRock A. Hudson
Dave. 1st floor lobby bathrooms ; 2nd floor common area wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Duplicate request.
Electrical Rough-In9/8/20169/8/20169/8/2016PPASS
DetailsRock A. Hudson
Dave. 1st floor lobby bathrooms ; 2nd floor common area wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy
1st floor conference rm, west elevator lobby walls and hardlids, bathroom walls and hardlids, valet walls.
2nd floor offices, gym, bath walls and hardlids, hospitality rm wall and hardlid, hold on hospitality bath ceiling accesses not framed yet. areas noted rough in ok cover
Conference9/7/20169/8/20169/8/2016PDONE
DetailsRock A. Hudson
Sean. Design team wanted to conference on additional outlets requested under 210.60. Can you call 1/2 hour prior to heading to the site. Phone #: ###-#### Inspection requested via web by Sean DeLacy
Will meet 9-10-16 9 am to sign off on room layouts when furniture is visible on drawings.
Electrical Rough-In9/1/20169/2/20169/2/2016APASS
DetailsEric Story
Dave. 3rd Floor rough in. Phone #: ###-#### Inspection requested via web by Sean DeLacy
2nd floor bath hard lids only,2nd floor storage wall ok cover
3rd floor 331,330,329,326,322,321,318,317,316 interior walls unit314 hall wall interior only ok cover
Electrical Rough-In8/29/20168/30/20168/30/2016APASS
DetailsEric Story
Dave. 3rd floor wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy
rooms 331,329,327,323,319,315 one siding ok to insulate and cover, every other rooms to be inspected on another day
Electrical Rough-In8/24/20168/24/20168/24/2016PPASS
DetailsEric Story
Dave. 2nd Floor Rough In. Phone #: ###-#### Inspection requested via web by Sean DeLacy
Main floor lobby walls and hard lids (as noted) 2nd floor rooms(as noted)4th floor corridors(as noted)
Electrical Rough-In8/23/20168/23/20168/23/2016APASS
DetailsMark Moncarr
Dave. 2nd floor rough cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy As noted on contractors print. Areas ok to cover.
Electrical Rough-In8/17/20168/17/20168/18/2016PDONE
DetailsRock A. Hudson
2nd Floor Rough Phone #: ###-#### Inspection requested via web by Buster Bowen discussed 210.60 clarification on code reference. Conference only As per Daryl Degrange the required outlets shall follow 210.52 and the minimum number of receptacles is not permitted to be reduced and should be determined by assuming the furniture is not in place.
Electrical Rough-In8/15/20168/15/20168/15/2016PFAIL
DetailsRock A. Hudson
Dave. Phone #: ###-#### Inspection requested via web by Sean DeLacy
210.60- Receptacle outlets required as discribed in 210.51(A).