Final | 7/13/2017 | 7/14/2017 | 7/14/2017 | A | PASS |
Eric Story
|
|
|
Randy. Phone #: ###-#### Inspection requested via web by Sean DeLacy Final ok
|
Final | 2/10/2017 | 2/10/2017 | 2/10/2017 | P | PART |
Eric Story
|
|
|
Check penthouse #2 for AFCI protection and undercounter lighting whip 6th floor correction fixed on penthouse 2, combined all lighting circuits on one AFCI breaker. All units in 6th floor now ok occupy
|
Electrical Rough-In | 2/9/2017 | 2/10/2017 | 2/10/2017 | A | FAIL |
Eric Story
|
|
|
Matt. Penthouse final. Phone #: ###-#### Inspection requested via web by Sean DeLacy AFCI protection for bedroom and undercounter whip in kitchen
|
Electrical Rough-In | 2/7/2017 | 2/8/2017 | 2/8/2017 | P | CANC |
Eric Story
|
|
|
Matt. 6th floor capitol units final. Phone #: ###-#### Inspection requested via web by Sean DeLacy Needed partial final for 6th floor
|
Final | 2/8/2017 | 2/8/2017 | 2/8/2017 | P | PART |
Eric Story
|
|
|
Matt. 6th floor capitol units final. Phone #: ###-#### Inspection requested via web by Sean DeLacy 6th floor remaining rooms minus penthouse 1@2@3 ok occupie
|
Permanent Service | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | CANC |
Eric Story
|
|
|
Matt. Meyers Pedestal. Phone #: ###-#### Inspection requested via web by Sean DeLacy Need a seperate permit for different service
|
Electrical Rough-In | 2/2/2017 | 2/3/2017 | 2/3/2017 | P | CANC |
Eric Story
|
|
|
Matt. Final on 6th floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy Needed partial for 6th floor
|
Final | 2/3/2017 | 2/3/2017 | 2/3/2017 | P | PART |
Eric Story
|
|
|
Matt. Final on 6th floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy 6th floor Myrtle side only minus penthouse 3 ok to occupy
|
Electrical Rough-In | 1/20/2017 | 1/20/2017 | 1/20/2017 | P | CANC |
Eric Story
|
|
|
Matt. Final on 5th Floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy needed temp oc
|
Final | 1/20/2017 | 1/20/2017 | 1/20/2017 | P | PART |
Eric Story
|
|
|
Matt. Final on 5th Floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy All of 5th floor ok will need to check 513 for receptacle to be added in bath
|
Electrical Rough-In | 1/13/2017 | 1/13/2017 | 1/13/2017 | P | PASS |
Eric Story
|
|
|
Please come close to 12:00 if possible. Level 6 penthouses, level 4, and level 2/3 bathroom re-inspection. Matt Mouser is the onsite contact. Phone #: ###-#### Inspection requested via web by Buster Bowen 6th floor penthouses walls and hard lids ok cover
|
Final | 1/13/2017 | 1/13/2017 | 1/13/2017 | P | PART |
Eric Story
|
|
|
Please come close to 12:00 if possible. Level 6 penthouses, level 4, and level 2/3 bathroom re-inspection. Matt Mouser is the onsite contact. Phone #: ###-#### Inspection requested via web by Buster Bowen FLoors 1 thru 4 temp occ only ok(verified corrections in baths and remaining light boxes and type mc whips safe ended)
|
Electrical Rough-In | 1/9/2017 | 1/10/2017 | 1/10/2017 | P | FAIL |
Eric Story
|
|
|
Matt. Final on floor 4. Phone #: ###-#### Inspection requested via web by Sean DeLacy 415,417 had open wires-402,403,413 units in-op-all receptacles abve f/p for tv's were not tamper resistant nor were all bathrooms and within 6' of sinks in floors 2,3,4-storage rooms and file rooms not ready
|
Electrical Rough-In | 1/4/2017 | 1/5/2017 | 1/5/2017 | P | PASS |
Rock A. Hudson
|
|
|
Matt. Level 6 corridor and remaining units rough in. Final for level 3. Phone #: ###-#### Inspection requested via web by Sean DeLacy 3rd floor rooms 301 open boxes, 302, 303, 304, 305, 307, 309, 310, 312, 313 add recept for 2nd bath vanity, 314, 316, 317, 318, 319, 322, 323, 325, 327, 329, 331. Rooms without notes ok occupy. 6th floor rooms 605, 60, 69, 610 and capitol corridor hardlid rough in ok cover.
|
Electrical Rough-In | 12/27/2016 | 12/28/2016 | 12/28/2016 | P | PASS |
Eric Story
|
|
|
Matt. Level 6 corridor. Phone #: ###-#### Inspection requested via web by Sean DeLacy 6th floor on myrtle side corridor hard lids ok cover
|
Electrical Rough-In | 12/20/2016 | 12/21/2016 | 12/21/2016 | P | PASS |
Rock A. Hudson
|
|
|
Matt. Level 6 elevator lobby. Phone #: ###-#### Inspection requested via web by Sean DeLacy Area noted and walls and hardlids for rooms 611, 613, 614 rough in ok cover
|
Final | 12/15/2016 | 12/16/2016 | 12/16/2016 | P | PART |
Eric Story
|
|
|
Matt. Partial TO final on floors 1 ; 2. Phone #: ###-#### Inspection requested via web by Sean DeLacy Lobby and office areas are ok to train, 2nd floor corridor and laundry area ok. Rooms on east wing checed out ok, east wing other then fitness room ok
|
Final | 12/14/2016 | 12/15/2016 | 12/15/2016 | A | FAIL |
Eric Story
|
|
|
Dave. Partial final floors 1 ; 2. Phone #: ###-#### Inspection requested via web by Sean DeLacy Shall blank all unused or not hung light fixtures@remove all temp cords from areas as needed BCO 4-05-32 It shall be unlawful to cover or conceal electrical equipment from inspection or installation, remove furniture or equipment from walls as needed All LV shall be blank off or installed GFCI protection for equipment shall be readily accessible.
|
Electrical Rough-In | 12/13/2016 | 12/13/2016 | 12/13/2016 | P | PASS |
Eric Story
|
|
|
Dave. Garage inspection ; 6th floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy Areas an noted on inspection logbook ok cover
|
Electrical Rough-In | 12/8/2016 | 12/8/2016 | 12/8/2016 | P | PASS |
Rock A. Hudson
|
|
|
Garage Ceiling cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Garage hard lid to "T" and rooms 618, 622, 626, 627, 630 rough in ok cover.
|
Electrical Rough-In | 12/5/2016 | 12/6/2016 | 12/6/2016 | A | PASS |
Eric Story
|
|
|
Garage and misc ceilings for early AM Garage ceilings to 3rd column and 2 floor offices and misc rooms as noted ok cover
|
Electrical Rough-In | 12/5/2016 | 12/5/2016 | 12/5/2016 | P | NR |
Eric Story
|
|
|
Dave. Garage ceiling cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Not ready
|
Electrical Rough-In | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PASS |
Eric Story
|
|
|
Dave. 5th floor capitol corridor. Phone #: ###-#### Inspection requested via web by Sean DeLacy 5th floor capitol blvd corridor hard lids ok cover
|
Electrical Rough-In | 11/22/2016 | 11/22/2016 | 11/22/2016 | P | PASS |
Eric Story
|
|
|
6th floor cover. Dave onsite Phone #: ###-#### Inspection requested via web by Buster Bowen Ares noted on on inspection record 5th floor rooms and 6th floor demizing walls on myrtle side ok cover
|
Electrical Rough-In | 11/16/2016 | 11/16/2016 | 11/16/2016 | A | PASS |
Eric Story
|
|
|
Dave. Phone #: ###-#### Inspection requested via web by Sean DeLacy 5th floor myrtle side corrridor hard lid only ok cover and as noted on inspection record
|
Electrical Rough-In | 11/11/2016 | 11/14/2016 | 11/14/2016 | A | PASS |
Eric Story
|
|
|
Dave. Phone #: ###-#### Inspection requested via web by Sean DeLacy room 503 ok cover
|
Electrical Rough-In | 11/11/2016 | 11/14/2016 | 11/14/2016 | A | PASS |
Eric Story
|
|
|
Dave. Phone #: ###-#### Inspection requested via web by Sean DeLacy Room 503 ok cover
|
Electrical Rough-In | 11/9/2016 | 11/10/2016 | 11/10/2016 | A | PASS |
Eric Story
|
|
|
Dave. Floor 5 ; 6. Phone #: ###-#### Inspection requested via web by Sean DeLacy Areas as noted on inspection record ok cover 5th and 6th floor
|
Electrical Rough-In | 11/4/2016 | 11/4/2016 | 11/4/2016 | A | PASS |
Eric Story
|
|
|
Dave. 4th floor corridor. Phone #: ###-#### Inspection requested via web by Sean DeLacy 4th floor hardlids in corridor and remaining rooms on 4th floor walls and two rooms on 5th floor as marked on inspection record ok cover
|
Electrical Rough-In | 11/2/2016 | 11/2/2016 | 11/2/2016 | P | PASS |
Eric Story
|
|
|
Dave. 4th floor cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Floors 4@5 as noted on inspection record ok cover
|
Electrical Rough-In | 10/27/2016 | 10/27/2016 | 10/27/2016 | A | PASS |
James Ady
|
|
|
Dave. 4th floor wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy 4th floor walls only and 6th floor corridor Ceiling only As marked on print. ok to cover
|
Electrical Rough-In | 10/21/2016 | 10/21/2016 | 10/21/2016 | P | PASS |
Eric Story
|
|
|
Dave. Wall cover 5th floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy 5th floor walls as marked on record only ok cover
|
Electrical Rough-In | 10/18/2016 | 10/19/2016 | 10/19/2016 | A | PASS |
Eric Story
|
|
|
Dave. Phone #: ###-#### Inspection requested via web by Sean DeLacy 6th floor hard lids and 4th floor rooms as noted ok cover
|
Electrical Rough-In | 10/14/2016 | 10/17/2016 | 10/17/2016 | A | PASS |
Eric Story
|
|
|
4th Floor wall cover capital side. Phone #: ###-#### Inspection requested via web by Sean DeLacy 3rd floor corridor on myrtle side only/4th floor as marked on inspection record ok cover
|
Electrical Rough-In | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | PASS |
James Ady
|
|
|
Dave. 5th floor ceiling Capitol side of building. Phone #: ###-#### Inspection requested via web by Sean DeLacy 5th floor ceiling only ok to cover
|
Electrical Rough-In | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | CANC |
James Ady
|
|
|
Dave. 5th floor ceiling Capitol side of building. Phone #: ###-#### Inspection requested via web by Sean DeLacy Duplicate inspection request
|
Electrical Rough-In | 10/10/2016 | 10/11/2016 | 10/11/2016 | A | PASS |
Eric Story
|
|
|
Dave 5th floor exterior wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy 5th floor exterior walls and 2nd floor elevator ceiling as noted on inspection record ok cover
|
Electrical Rough-In | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | PASS |
Eric Story
|
|
|
2nd Floor common are ceiling cover. Dave is the onsite contact. Phone #: ###-#### Inspection requested via web by Buster Bowen 2nd floor corridor hard lids and 3rd floor rooms as noted on record ok cover
|
Conference | 10/4/2016 | 10/4/2016 | 10/4/2016 | P | PASS |
Eric Story
|
|
|
Dave is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen EC has cans above shower stalls and was needing to know what kind of trim was needed
|
Permanent Service | 10/4/2016 | 10/4/2016 | 10/4/2016 | P | PASS |
Eric Story
|
|
|
Dave is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen p/s u/g n ok
|
Electrical Rough-In | 10/4/2016 | 10/4/2016 | 10/4/2016 | P | PASS |
Eric Story
|
|
|
Dave is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen 3rd floor fireplace walls and headboard and bath walls and hard lids as noted on print ok
|
Electrical Rough-In | 9/29/2016 | 9/30/2016 | 9/30/2016 | A | PASS |
Eric Story
|
|
|
Dave. 3rd floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy 3rd floor south units walls for fireplace and headboard walls and bath hard lids as noted on inspection record ok cover
|
Electrical Rough-In | 9/26/2016 | 9/27/2016 | 9/27/2016 | A | CANC |
Eric Story
|
|
|
Dave. 3rd floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy duplicate inspection called in
|
Electrical Rough-In | 9/26/2016 | 9/27/2016 | 9/27/2016 | A | PASS |
Eric Story
|
|
|
Dave. 3rd floor. Phone #: ###-#### Inspection requested via web by Sean DeLacy 3rd floor rooms noted on print bathroom hardlids,f/p and headboard walls ok cover
|
Electrical Rough-In | 9/22/2016 | 9/22/2016 | 9/22/2016 | P | PASS |
Eric Story
|
|
|
Dave. Rough in floors 3-4. Phone #: ###-#### Inspection requested via web by Sean DeLacy units 302,304 interior walls as noted only, 310 west wall and bath hard lid,415,421,423,425,429 interior walls as noted and storage walls only ok cover
|
Electrical Rough-In | 9/14/2016 | 9/14/2016 | 9/14/2016 | P | PASS |
Eric Story
|
|
|
Dave. 2nd floor laundry room. Phone #: ###-#### Inspection requested via web by Sean DeLacy 2nd floor laundry walls ok cover. Also discussed cut out in top of main gear and EC will provide abrasion protection around edges for wires.
|
Electrical Rough-In | 9/12/2016 | 9/12/2016 | 9/12/2016 | A | PASS |
Eric Story
|
|
|
Dave. Floor 2 ; 3. Phone #: ###-#### Inspection requested via web by Sean DeLacy 2nd and 3rd floor as noted on inspection record ok cover
|
Electrical Rough-In | 9/12/2016 | 9/12/2016 | 9/12/2016 | A | PASS |
Eric Story
|
|
|
Dave. Floor 2 ; 3. Phone #: ###-#### Inspection requested via web by Sean DeLacy 2nd and 3rd floor as noted on inspection record ok cover
|
Conference | 9/8/2016 | 9/9/2016 | 9/9/2016 | A | DONE |
Eric Story
|
|
|
Meet for room receptacles designations at 200 Broad st. 9am Discussed layout of receptacles in all floor plans, will go by print for readily accessible layout for furniture and accesibility of receptacles.
|
Conference | 9/8/2016 | 9/9/2016 | 9/9/2016 | A | DONE |
Rock A. Hudson
|
|
|
Meeting for room receptacle designation at 200 Broad st. 9am Discussed receptacle layouts in each floor plan and noted on prints to be forewarded to contractor on site.
|
Final | 9/8/2016 | 9/9/2016 | 9/8/2016 | A | CANC |
Rock A. Hudson
|
|
|
Meeting for room receptacle designation at 200 Broad st. 9am Needed conference
|
Electrical Rough-In | 9/8/2016 | 9/8/2016 | 9/8/2016 | P | CANC |
Rock A. Hudson
|
|
|
Dave. 1st floor lobby bathrooms ; 2nd floor common area wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Duplicate request.
|
Electrical Rough-In | 9/8/2016 | 9/8/2016 | 9/8/2016 | P | PASS |
Rock A. Hudson
|
|
|
Dave. 1st floor lobby bathrooms ; 2nd floor common area wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy 1st floor conference rm, west elevator lobby walls and hardlids, bathroom walls and hardlids, valet walls. 2nd floor offices, gym, bath walls and hardlids, hospitality rm wall and hardlid, hold on hospitality bath ceiling accesses not framed yet. areas noted rough in ok cover
|
Conference | 9/7/2016 | 9/8/2016 | 9/8/2016 | P | DONE |
Rock A. Hudson
|
|
|
Sean. Design team wanted to conference on additional outlets requested under 210.60. Can you call 1/2 hour prior to heading to the site. Phone #: ###-#### Inspection requested via web by Sean DeLacy Will meet 9-10-16 9 am to sign off on room layouts when furniture is visible on drawings.
|
Electrical Rough-In | 9/1/2016 | 9/2/2016 | 9/2/2016 | A | PASS |
Eric Story
|
|
|
Dave. 3rd Floor rough in. Phone #: ###-#### Inspection requested via web by Sean DeLacy 2nd floor bath hard lids only,2nd floor storage wall ok cover 3rd floor 331,330,329,326,322,321,318,317,316 interior walls unit314 hall wall interior only ok cover
|
Electrical Rough-In | 8/29/2016 | 8/30/2016 | 8/30/2016 | A | PASS |
Eric Story
|
|
|
Dave. 3rd floor wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy rooms 331,329,327,323,319,315 one siding ok to insulate and cover, every other rooms to be inspected on another day
|
Electrical Rough-In | 8/24/2016 | 8/24/2016 | 8/24/2016 | P | PASS |
Eric Story
|
|
|
Dave. 2nd Floor Rough In. Phone #: ###-#### Inspection requested via web by Sean DeLacy Main floor lobby walls and hard lids (as noted) 2nd floor rooms(as noted)4th floor corridors(as noted)
|
Electrical Rough-In | 8/23/2016 | 8/23/2016 | 8/23/2016 | A | PASS |
Mark Moncarr
|
|
|
Dave. 2nd floor rough cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy As noted on contractors print. Areas ok to cover.
|
Electrical Rough-In | 8/17/2016 | 8/17/2016 | 8/18/2016 | P | DONE |
Rock A. Hudson
|
|
|
2nd Floor Rough Phone #: ###-#### Inspection requested via web by Buster Bowen discussed 210.60 clarification on code reference. Conference only As per Daryl Degrange the required outlets shall follow 210.52 and the minimum number of receptacles is not permitted to be reduced and should be determined by assuming the furniture is not in place.
|
Electrical Rough-In | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | FAIL |
Rock A. Hudson
|
|
|
Dave. Phone #: ###-#### Inspection requested via web by Sean DeLacy 210.60- Receptacle outlets required as discribed in 210.51(A).
|