Final | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | PASS |
Mark Moncarr
|
|
|
units 209 , 210, 211 , 212 , 309 , 310 , 311 , 312, 1411 ,com room , and TI Last of the Finals Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Ok final
|
Final | 7/6/2017 | 7/6/2017 | 7/6/2017 | P | PART |
Mark Moncarr
|
|
|
unit 213,214,215,313,314,315, LW#4 LW#% bicycle Tenant storage Stair #1 #2 Phone #: ###-#### Inspection requested via web by Tom Betty All rooms listed above including POD 1,2 & 4 corridor lighting, and com room. Partial final
|
Electrical Rough-In | 6/26/2017 | 6/27/2017 | 6/27/2017 | A | PASS |
Mark Moncarr
|
|
|
Electrical room Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover elec room
|
Final | 6/21/2017 | 6/22/2017 | 6/22/2017 | A | PART |
Mark Moncarr
|
|
|
unit 205 , 206 , 207 , 208 , 305 , 306 , 307 , 308 , LW#6 (1423) and LW#2-2(1415 Phone #: ###-#### Inspection requested via web by Tom Betty Partial on units listed above.
|
Final | 6/20/2017 | 6/21/2017 | 6/21/2017 | A | PART |
Mark Moncarr
|
|
|
units 201 , 202 , 203 , 204 , 301 , 302 , 303 , 304 , LW#1 (7433) , LW#2 (7429) Phone #: ###-#### Inspection requested via web by Tom Betty Partial final for rooms listed.
|
Final | 6/12/2017 | 6/13/2017 | 6/12/2017 | A | CANC |
Mark Moncarr
|
|
|
Re-inspect 301 , 302 , 303 , 304 , 402 , 403 , 404 and finals on 401 , 405 call Craig Phone #: ###-#### >> Inspection requested via web by Tom Betty Inspection cancelled from web by: Cathy Duchek
|
Electrical Rough-In | 6/7/2017 | 6/7/2017 | 6/7/2017 | A | PASS |
Mark Moncarr
|
|
|
Third floor hallway and drop ceilings Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover 2&3rd floor bath lids and ERU's, and 3rd floor hall
|
Electrical Rough-In | 6/5/2017 | 6/5/2017 | 6/5/2017 | P | PASS |
Mark Moncarr
|
|
|
trench work to cover Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover ground work for 2-4", 3-2" and 1 parking lot light. NE corner on ground floor for TI
|
Electrical Rough-In | 6/2/2017 | 6/2/2017 | 6/2/2017 | A | PASS |
Mark Moncarr
|
|
|
LW #6 east wall Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty ok cover
|
Permanent Service | 6/1/2017 | 6/1/2017 | 6/1/2017 | A | PASS |
Mark Moncarr
|
|
|
Service Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty p/s u/g n ok. 3/0 GEC
|
Electrical Rough-In | 5/25/2017 | 5/26/2017 | 5/26/2017 | A | PASS |
Mark Moncarr
|
|
|
LW #4 and LW#5 ERU''s Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover. LW #6 ok cover except E wall
|
Electrical Rough-In | 5/23/2017 | 5/24/2017 | 5/24/2017 | A | PASS |
Mark Moncarr
|
|
|
Pod #4 drop bathroom ceilings Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover 2nd and 3rd floor bath lids and ERU's POD #4
|
Electrical Rough-In | 5/22/2017 | 5/23/2017 | 5/23/2017 | A | PASS |
Mark Moncarr
|
|
|
Trench inspection Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover 4-3in pvc for service feeders, 2-4in and 3-2in for phones, and 2-3/4 for parking lot lights
|
Electrical Rough-In | 5/18/2017 | 5/19/2017 | 5/19/2017 | A | PASS |
Mark Moncarr
|
|
|
Stair #4 3rd floor Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover stairwell #4
|
Electrical Rough-In | 5/15/2017 | 5/15/2017 | 5/15/2017 | A | PASS |
Mark Moncarr
|
|
|
Soffits call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover soffits on E and N side ground level
|
Electrical Rough-In | 5/9/2017 | 5/10/2017 | 5/10/2017 | A | PASS |
Mark Moncarr
|
|
|
Units 209 , 210 , 211 , 212 , 213 , 214 , 215 , remainder stairs #3 , #4 ,LW#4 LW #5 , Tele com rm , Trash rm , and parking #4 call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover items listed above
|
Electrical Rough-In | 5/4/2017 | 5/5/2017 | 5/5/2017 | A | PASS |
Mark Moncarr
|
|
|
Units 309 , 310 , 311 , 312 , 313 , 314 , 315 and stairs #3 , #4 third floor only Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover floors listed and stairwell #3 & #4 ceilings
|
Electrical Rough-In | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | PASS |
Mark Moncarr
|
|
|
Units 205,206,207,208,305,306,307,308,3rd floor hallway and bathrooms call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover said rooms and 3rd floor hall
|
Electrical Rough-In | 3/31/2017 | 4/3/2017 | 4/3/2017 | A | PASS |
Mark Moncarr
|
|
|
Unit 206 , 306 and electrical room Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty 206 & 306 beds ok cover. Ok cover N and W wall electrical room
|
Electrical Rough-In | 3/24/2017 | 3/27/2017 | 3/27/2017 | A | PASS |
Mark Moncarr
|
|
|
LW-2 and parking garage 2 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover garage #2 and live/work #2
|
Electrical Rough-In | 3/16/2017 | 3/17/2017 | 3/17/2017 | A | PASS |
Mark Moncarr
|
|
|
units 305,306,307,308,205,206,207,208, and hallway Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover 2,3 floor hallway, rms 206/306 up to living wall that seperates bedroom. Cover 1st floor live/work #3
|
Electrical Rough-In | 3/7/2017 | 3/8/2017 | 3/8/2017 | A | PASS |
Mark Moncarr
|
|
|
Hallway and third floor bathrooms Call craig Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover 3rd floor hall/stairwell lid and 5 baths ceilings
|
Electrical Rough-In | 2/28/2017 | 2/28/2017 | 2/28/2017 | P | PASS |
Mark Moncarr
|
|
|
Two soffits to look at Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty 2 outside soffits north side ok cover.
|
Electrical Rough-In | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | PASS |
Rock A. Hudson
|
|
|
Units 301,302,303,304,201,202,203,204,LW #1,LW#2,Fire riser room,stair #1 parking #1 and storage room Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Live/ work shall have showroom window receptacles. Check under ground in liveworks islands is UF cable not MN cable. Areas noted plus west hallways rough in ok cover. Drop ceilings in future.
|
Electrical Rough-In | 8/11/2016 | 8/12/2016 | 8/12/2016 | A | PASS |
Rock A. Hudson
|
|
|
Uffer ground inspection. Contact Craig Timmons Phone #: ###-#### Inspection requested via web by Cathy Duchek Concrete encase electrode rough in ok cover.
|