Final | 11/6/2017 | 11/7/2017 | 11/7/2017 | A | PASS |
Eric Story
|
|
|
Call Rafael to discuss final for project. As close to 12 as possible. Phone #: ###-#### Inspection requested via web by Rafael Castillo Final ok could not locate sign off sheet
|
Electrical Rough-In | 3/29/2017 | 3/29/2017 | 3/29/2017 | A | CANC |
Eric Story
|
|
|
Need to have an inspector''s signature in the project progress log for verification of yesterday''s TCO approval in phase 2 areas. Please shoot for around 10am so that ESI can ensure their log book will be available, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Needed partial final
|
Final | 3/29/2017 | 3/29/2017 | 3/29/2017 | P | PART |
Eric Story
|
|
|
Need to have an inspector''s signature in the project progress log for verification of yesterday''s TCO approval in phase 2 areas. Please shoot for around 10am so that ESI can ensure their log book will be available, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Phase 2 areas ok to occupy, WIll need Toby with Mountain power to final his permit on lighting accross walkway for Final
|
Electrical Rough-In | 3/28/2017 | 3/28/2017 | 3/28/2017 | P | PASS |
Rock A. Hudson
|
|
|
Part final for phase 2 area for TCO purposes. Call Rafael as close to 3pm as possible. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo 2nd floor lighting off center on grove building This permit, 1st level cans center on grove core and shell permit. Outdoor receptacles need WR as per 406.12. TCO stair 1, 2 bridge and concourse OK
|
Electrical Rough-In | 3/20/2017 | 3/20/2017 | 3/20/2017 | A | PASS |
Eric Story
|
|
|
Call Rafael for ceiling grid inspection of the concourse level. As close to 10:00am as possible. Phone #: ###-#### Inspection requested via web by Rafael Castillo Ceilings in corridor as noted and underground for tying in existing branch circuits also ok cover
|
Electrical Rough-In | 3/16/2017 | 3/16/2017 | 3/16/2017 | P | PASS |
Eric Story
|
|
|
Call Rafael for inspection of office 103 and hard lid level 1 near stair 1. As close to 1200pm as possible, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Area as noted on print ceilings and walls ok cover
|
Electrical Rough-In | 3/14/2017 | 3/14/2017 | 3/14/2017 | A | PASS |
Rock A. Hudson
|
|
|
Call Rafael for inspection of ceiling grid and walls on concourse level. Phone #: ###-#### Inspection requested via web by Rafael Castillo Lobby area 100 hardlid and grid at top of escalator rough in ok cover
|
Electrical Rough-In | 3/1/2017 | 3/1/2017 | 3/1/2017 | A | PASS |
Eric Story
|
|
|
Call Rafael for inspection of walls needing to be insulated on concourse level. Inspect conduit on east end of building that is being covered by EIFS system. Early AM preferred. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Areas as noted ok cover
|
Electrical Rough-In | 2/23/2017 | 2/24/2017 | 2/24/2017 | A | PASS |
Eric Story
|
|
|
Call Rafael for ceiling grid inspection of 2nd floor above scaffolding. As early in the morning as possible preferred. Phone #: ###-#### Inspection requested via web by Rafael Castillo 2nd floor ceiling as noted on print ok cover
|
Electrical Rough-In | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | PASS |
Eric Story
|
|
|
Rough in inspection of stair 2, discuss conduit for architectural lighting. Call Rafael. Phone #: ###-#### Inspection requested via web by Rafael Castillo Areas as noted on print ok cover
|
Electrical Rough-In | 2/21/2017 | 2/21/2017 | 2/21/2017 | P | PASS |
Eric Story
|
|
|
Call Rafael for wall inspection on 2nd level of concourse. As close to 12 as possible. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo 2nd floor walls and ceiling as noted on print ok cover
|
Electrical Rough-In | 2/15/2017 | 2/15/2017 | 2/15/2017 | P | PASS |
Eric Story
|
|
|
Call Rafael for inspection of west soffit area under concourse. Discuss access panel requirements for large junction boxes at stair 1. 12-1pm time frame preferred. Phone #: ###-#### Inspection requested via web by Rafael Castillo Area as noted on print ok cover, also discussed sizing of access panel to ake them big enough for servicing and removing of equipment
|
Electrical Rough-In | 2/13/2017 | 2/13/2017 | 2/13/2017 | P | PASS |
Eric Story
|
|
|
Call Rafael for inspection of concourse 1st level, floor boxes in ballroom, and 2nd floor west concourse ceiling. Preferably a 1-2pm time frame, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Areas as noted on print ok cover
|
Electrical Rough-In | 2/8/2017 | 2/8/2017 | 2/8/2017 | P | PASS |
Eric Story
|
|
|
Call Rafael for inspection of north wall on dance floor, stair 1, and level 1 under concourse lighting r/i. Early PM preferred (12-1pm). Phone #: ###-#### Inspection requested via web by Rafael Castillo Areas as noted on print ok cover
|
Conference | 1/26/2017 | 1/27/2017 | 1/27/2017 | A | DONE |
Eric Story
|
|
|
Discuss rough in under concourse. Phone #: ###-#### Inspection requested via web by Rafael Castillo Discussed rough-in requirements when over pass is framed due to lights not in on time, able to cut in after framing and will take pictures and leave 2 or 3 to look at
|
Conference | 12/12/2016 | 12/13/2016 | 12/13/2016 | A | DONE |
Eric Story
|
|
|
Need conference for branch circuits running through seperate buildings Discussed feeding skybridge sign power from house panel only
|
Conference | 12/9/2016 | 12/12/2016 | 12/12/2016 | A | NR |
Eric Story
|
|
|
Call Rafael to discuss requirements for branch circuit supply from different building. Phone #: ###-#### Inspection requested via web by Rafael Castillo Need proper info for inspection and conference
|
Electrical Rough-In | 10/26/2016 | 10/27/2016 | 10/27/2016 | A | PASS |
Rock A. Hudson
|
|
|
Call Chris for inspection of stair 1 ; 2 masonry. Phone #: ###-#### Inspection requested via web by Rafael Castillo Stack 7 stair 1 and 2 rough in ok cover
|
Electrical Rough-In | 10/25/2016 | 10/26/2016 | 10/26/2016 | A | PASS |
Rock A. Hudson
|
|
|
Call Chris for inspection of stair 1 masonry. Phone #: ###-#### Inspection requested via web by Rafael Castillo Stack 6 stair 1 rough in ok cover
|
Electrical Rough-In | 10/25/2016 | 10/25/2016 | 10/25/2016 | A | NR |
Eric Story
|
|
|
Call Chris for inspection of stair 1 masonry. Phone #: ###-#### Inspection requested via web by Rafael Castillo Masons got rained out couldnt finish conduit install
|
Electrical Rough-In | 10/21/2016 | 10/24/2016 | 10/24/2016 | A | PASS |
Eric Story
|
|
|
Stairway #2 Masonry Rough-in Contact Chris Gardner Phone #: ###-#### Inspection requested via web by Cathy Duchek Stair 2 lift 6 ok cover
|
Electrical Rough-In | 10/19/2016 | 10/20/2016 | 10/20/2016 | A | PASS |
Eric Story
|
|
|
Rough-In Inspection in Stairwells #1;2 Contact Chris Gardner Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Lift 5 stair 1@2 ok pour
|
Electrical Rough-In | 10/12/2016 | 10/14/2016 | 10/14/2016 | P | PASS |
Eric Story
|
|
|
Call for masonry inspection of stair 1, 2, and elevator shaft. Phone #: ###-#### Inspection requested via web by Rafael Castillo Lift 4 stair 1@2 and elevator walls ok pour
|
Electrical Rough-In | 10/12/2016 | 10/12/2016 | 10/12/2016 | P | PASS |
Eric Story
|
|
|
Call Rafael for masonry inspection of stair 1, 2, and elevator pit. Phone #: ###-#### Inspection requested via web by Rafael Castillo Stairs 1 @ 2 lift 4 ok to pour
|
Electrical Rough-In | 10/7/2016 | 10/10/2016 | 10/10/2016 | A | PASS |
Rock A. Hudson
|
|
|
Call Chris for inspection of masonry walls at stair 1 ; 2 and elevator pit. Phone #: ###-#### Inspection requested via web by Rafael Castillo Areas noted up to exit signs rough in ok cover
|
Electrical Rough-In | 10/5/2016 | 10/5/2016 | 10/5/2016 | P | PASS |
Eric Story
|
|
|
As close to a 1200 inspection as possible. Call Chris for inspection of masonry walls at elevator pit area. Phone #: ###-#### Inspection requested via web by Rafael Castillo Stair 1 and storage lift 1 ok pour
|
Electrical Rough-In | 9/30/2016 | 10/3/2016 | 10/3/2016 | A | PASS |
Eric Story
|
|
|
Call for inspection of masonry at stair 2 and to discuss inspections in the future at masonry walls. Phone #: ###-#### Inspection requested via web by Rafael Castillo Stair stack one ok cover, also discussed mason trying to grout proir to inspection being done
|
Electrical Rough-In | 9/23/2016 | 9/23/2016 | 9/23/2016 | A | PASS |
Eric Story
|
|
|
Call Rafael for inspection of rough in of conduit in escalator pit. Phone #: ###-#### Inspection requested via web by Rafael Castillo undrground for perimeter around base of escalator ok pour data & power conduits
|
Electrical Rough-In | 9/16/2016 | 9/19/2016 | 9/19/2016 | A | PASS |
Eric Story
|
|
|
Call Rafael for inspection of underground at elevator pit. Phone #: ###-#### Inspection requested via web by Rafael Castillo Elevator pit underground ok pour
|
Electrical Rough-In | 8/31/2016 | 8/31/2016 | 8/31/2016 | P | PASS |
Eric Story
|
|
|
Call Chris for inspection of vault terminations and terminations at existing service disconnects. Phone #: ###-#### Inspection requested via web by Rafael Castillo Connections of extending wires feeding vault from main in down garage and connections OK. Ok to re-energize
|
Permanent Service | 8/31/2016 | 8/31/2016 | 8/31/2016 | P | PASS |
Eric Story
|
|
|
Call Chris for inspection of vault terminations and terminations at existing service disconnects. Phone #: ###-#### Inspection requested via web by Rafael Castillo EC only re-fed from existing gear to vault, no modification to service was done it will be demo and redone by others. p/s u/g rec ok
|
Conference | 8/22/2016 | 8/23/2016 | 8/23/2016 | A | DONE |
Rock A. Hudson
|
|
|
Call Rafael to discuss old service in parking garage pertaining to vault relocation. Phone #: ###-#### Inspection requested via web by Rafael Castillo Discussed the pulling of wire on load side of disconnect. Service change yet to be completed by others, height may change depending on how contractor chooses to assemble new service.
|
Electrical Rough-In | 8/19/2016 | 8/19/2016 | 8/19/2016 | A | PASS |
Rock A. Hudson
|
|
|
Call Chris for inspection of underground rough in at old vault location. Phone #: ###-#### Inspection requested via web by Rafael Castillo Underground for vault located outside north corner rough in ok cover
|
Electrical Rough-In | 8/19/2016 | 8/19/2016 | 8/19/2016 | P | CANC |
Eric Story
|
|
|
Call Chris for inspection of underground of old vault location. Phone #: ###-#### >> Inspection requested via web by Rafael Castillo Inspection cancelled from web by: Rafael Castillo
|