Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberELE16-02693
StatusFinaled
Name LEA ELECTRIC LLC
Site Address 850 W FRONT ST
Project NameBoise Centre 2015 Expansion
Customer Number3613
ePlanReviewNo
Description
Alteration: Complete electrical installation including boxes, raceways, tele/data, power to elevator, and escalator, lights, fixtures, receptacles and fire alarm per plans ***2-8-17 customer added $410,783 to the valuation of work /CEV***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final11/6/201711/7/201711/7/2017APASS
DetailsEric Story
Call Rafael to discuss final for project. As close to 12 as possible. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Final ok could not locate sign off sheet
Electrical Rough-In3/29/20173/29/20173/29/2017ACANC
DetailsEric Story
Need to have an inspector''s signature in the project progress log for verification of yesterday''s TCO approval in phase 2 areas. Please shoot for around 10am so that ESI can ensure their log book will be available, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Needed partial final
Final3/29/20173/29/20173/29/2017PPART
DetailsEric Story
Need to have an inspector''s signature in the project progress log for verification of yesterday''s TCO approval in phase 2 areas. Please shoot for around 10am so that ESI can ensure their log book will be available, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Phase 2 areas ok to occupy, WIll need Toby with Mountain power to final his permit on lighting accross walkway for Final
Electrical Rough-In3/28/20173/28/20173/28/2017PPASS
DetailsRock A. Hudson
Part final for phase 2 area for TCO purposes. Call Rafael as close to 3pm as possible.
Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo
2nd floor lighting off center on grove building This permit, 1st level cans center on grove core and shell permit. Outdoor receptacles need WR as per 406.12. TCO stair 1, 2 bridge and concourse OK
Electrical Rough-In3/20/20173/20/20173/20/2017APASS
DetailsEric Story
Call Rafael for ceiling grid inspection of the concourse level. As close to 10:00am as possible. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Ceilings in corridor as noted and underground for tying in existing branch circuits also ok cover
Electrical Rough-In3/16/20173/16/20173/16/2017PPASS
DetailsEric Story
Call Rafael for inspection of office 103 and hard lid level 1 near stair 1. As close to 1200pm as possible, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Area as noted on print ceilings and walls ok cover
Electrical Rough-In3/14/20173/14/20173/14/2017APASS
DetailsRock A. Hudson
Call Rafael for inspection of ceiling grid and walls on concourse level. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Lobby area 100 hardlid and grid at top of escalator rough in ok cover
Electrical Rough-In3/1/20173/1/20173/1/2017APASS
DetailsEric Story
Call Rafael for inspection of walls needing to be insulated on concourse level. Inspect conduit on east end of building that is being covered by EIFS system. Early AM preferred. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Areas as noted ok cover
Electrical Rough-In2/23/20172/24/20172/24/2017APASS
DetailsEric Story
Call Rafael for ceiling grid inspection of 2nd floor above scaffolding. As early in the morning as possible preferred. Phone #: ###-#### Inspection requested via web by Rafael Castillo
2nd floor ceiling as noted on print ok cover
Electrical Rough-In2/22/20172/23/20172/23/2017APASS
DetailsEric Story
Rough in inspection of stair 2, discuss conduit for architectural lighting. Call Rafael. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Areas as noted on print ok cover
Electrical Rough-In2/21/20172/21/20172/21/2017PPASS
DetailsEric Story
Call Rafael for wall inspection on 2nd level of concourse. As close to 12 as possible. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo
2nd floor walls and ceiling as noted on print ok cover
Electrical Rough-In2/15/20172/15/20172/15/2017PPASS
DetailsEric Story
Call Rafael for inspection of west soffit area under concourse. Discuss access panel requirements for large junction boxes at stair 1. 12-1pm time frame preferred. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Area as noted on print ok cover, also discussed sizing of access panel to ake them big enough for servicing and removing of equipment
Electrical Rough-In2/13/20172/13/20172/13/2017PPASS
DetailsEric Story
Call Rafael for inspection of concourse 1st level, floor boxes in ballroom, and 2nd floor west concourse ceiling. Preferably a 1-2pm time frame, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Areas as noted on print ok cover
Electrical Rough-In2/8/20172/8/20172/8/2017PPASS
DetailsEric Story
Call Rafael for inspection of north wall on dance floor, stair 1, and level 1 under concourse lighting r/i. Early PM preferred (12-1pm). Phone #: ###-#### Inspection requested via web by Rafael Castillo
Areas as noted on print ok cover
Conference1/26/20171/27/20171/27/2017ADONE
DetailsEric Story
Discuss rough in under concourse. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Discussed rough-in requirements when over pass is framed due to lights not in on time, able to cut in after framing and will take pictures and leave 2 or 3 to look at
Conference12/12/201612/13/201612/13/2016ADONE
DetailsEric Story
Need conference for branch circuits running through seperate buildings
Discussed feeding skybridge sign power from house panel only
Conference12/9/201612/12/201612/12/2016ANR
DetailsEric Story
Call Rafael to discuss requirements for branch circuit supply from different building. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Need proper info for inspection and conference
Electrical Rough-In10/26/201610/27/201610/27/2016APASS
DetailsRock A. Hudson
Call Chris for inspection of stair 1 ; 2 masonry. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Stack 7 stair 1 and 2 rough in ok cover
Electrical Rough-In10/25/201610/26/201610/26/2016APASS
DetailsRock A. Hudson
Call Chris for inspection of stair 1 masonry. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Stack 6 stair 1 rough in ok cover
Electrical Rough-In10/25/201610/25/201610/25/2016ANR
DetailsEric Story
Call Chris for inspection of stair 1 masonry. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Masons got rained out couldnt finish conduit install
Electrical Rough-In10/21/201610/24/201610/24/2016APASS
DetailsEric Story
Stairway #2 Masonry Rough-in
Contact Chris Gardner Phone #: ###-#### Inspection requested via web by Cathy Duchek
Stair 2 lift 6 ok cover
Electrical Rough-In10/19/201610/20/201610/20/2016APASS
DetailsEric Story
Rough-In Inspection in Stairwells #1;2
Contact Chris Gardner
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
Lift 5 stair 1@2 ok pour
Electrical Rough-In10/12/201610/14/201610/14/2016PPASS
DetailsEric Story
Call for masonry inspection of stair 1, 2, and elevator shaft. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Lift 4 stair 1@2 and elevator walls ok pour
Electrical Rough-In10/12/201610/12/201610/12/2016PPASS
DetailsEric Story
Call Rafael for masonry inspection of stair 1, 2, and elevator pit. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Stairs 1 @ 2 lift 4 ok to pour
Electrical Rough-In10/7/201610/10/201610/10/2016APASS
DetailsRock A. Hudson
Call Chris for inspection of masonry walls at stair 1 ; 2 and elevator pit. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Areas noted up to exit signs rough in ok cover
Electrical Rough-In10/5/201610/5/201610/5/2016PPASS
DetailsEric Story
As close to a 1200 inspection as possible. Call Chris for inspection of masonry walls at elevator pit area. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Stair 1 and storage lift 1 ok pour
Electrical Rough-In9/30/201610/3/201610/3/2016APASS
DetailsEric Story
Call for inspection of masonry at stair 2 and to discuss inspections in the future at masonry walls. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Stair stack one ok cover, also discussed mason trying to grout proir to inspection being done
Electrical Rough-In9/23/20169/23/20169/23/2016APASS
DetailsEric Story
Call Rafael for inspection of rough in of conduit in escalator pit. Phone #: ###-#### Inspection requested via web by Rafael Castillo
undrground for perimeter around base of escalator ok pour data & power conduits
Electrical Rough-In9/16/20169/19/20169/19/2016APASS
DetailsEric Story
Call Rafael for inspection of underground at elevator pit. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Elevator pit underground ok pour
Electrical Rough-In8/31/20168/31/20168/31/2016PPASS
DetailsEric Story
Call Chris for inspection of vault terminations and terminations at existing service disconnects. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Connections of extending wires feeding vault from main in down garage and connections OK.
Ok to re-energize
Permanent Service8/31/20168/31/20168/31/2016PPASS
DetailsEric Story
Call Chris for inspection of vault terminations and terminations at existing service disconnects. Phone #: ###-#### Inspection requested via web by Rafael Castillo
EC only re-fed from existing gear to vault, no modification to service was done it will be demo and redone by others. p/s u/g rec ok
Conference8/22/20168/23/20168/23/2016ADONE
DetailsRock A. Hudson
Call Rafael to discuss old service in parking garage pertaining to vault relocation. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Discussed the pulling of wire on load side of disconnect. Service change yet to be completed by others, height may change depending on how contractor chooses to assemble new service.
Electrical Rough-In8/19/20168/19/20168/19/2016APASS
DetailsRock A. Hudson
Call Chris for inspection of underground rough in at old vault location. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Underground for vault located outside north corner rough in ok cover
Electrical Rough-In8/19/20168/19/20168/19/2016PCANC
DetailsEric Story
Call Chris for inspection of underground of old vault location. Phone #: ###-#### >> Inspection requested via web by Rafael Castillo Inspection cancelled from web by: Rafael Castillo