Final | 11/16/2016 | 11/16/2016 | 11/16/2016 | P | PASS |
Mark Moncarr
|
|
|
Please call Andy 1/2 hour before for access ###-#### Phone #: ###-#### Inspection requested via web by Dan Rohl final ok
|
Permanent Service | 9/6/2016 | 9/7/2016 | 9/7/2016 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Dan Rohl p/s o/h rec ok
|
Electrical Rough-In | 8/22/2016 | 8/22/2016 | 8/22/2016 | P | PASS |
Daryl DeGrange
|
|
|
Rough-in ok cover studio,bedroom and bath.
|
Final | 8/22/2016 | 8/23/2016 | 8/22/2016 | A | NR |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Dan Rohl Not ready for final at this time.
|