Final | 11/8/2016 | 11/9/2016 | 11/9/2016 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by cal crosby....corrections made...ok to final
|
Final | 11/6/2016 | 11/7/2016 | 11/7/2016 | A | FAIL |
Tom Saunders
|
|
|
Remodel on back porch, kitchen, living and master bath. Phone #: ###-#### Inspection requested via web by cal crosby....
breaker lockouts needed installed on hardwired appliances-microwave,stove, and warming drawer
pantry outlet needs gfi protection
outlets on kitchen counter need gfi protection
jaquzzi tub access cannot be screwed shut for readily accessible
tile heat had no rough-in inspection electrical contractor taking full responsibility for install
|
Electrical Rough-In | 8/23/2016 | 8/24/2016 | 8/24/2016 | A | PASS |
Eric Story
|
|
|
Cal Phone #: ###-#### Inspection requested via web by cal Kitchen,patio,master bath, living room fireplace wall ok cover
|