Final | 11/30/2016 | 12/2/2016 | 12/2/2016 | P | PASS |
James Ady
|
|
|
Requesting final inspection on Friday 12/02/2016 on or after 3pm. Please call at least 1/2 hour before inspection so that I can make it home from work. Phone #: ###-#### Inspection requested via web by Mike Quinn final ok
|
Electrical Rough-In | 10/22/2016 | 10/24/2016 | 10/24/2016 | P | PASS |
James Ady
|
|
|
Trench/conduit inspection prior to backfill. Would like to schedule between 2:30-4:30pm if possible. Please call 1/2 hour ahead of time so that i can make it home. Phone #: ###-#### Inspection requested via web by Mike Quinn underground to shop only ok to cover
|
Permanent Service | 9/11/2016 | 9/14/2016 | 9/14/2016 | P | PASS |
James Ady
|
|
|
New panel, meter, mast, grounding, and conductors have been installed. Requesting an inspection so that i can schedule Idaho Power to change over to new service. Phone #: ###-#### Inspection requested via web by Mike Quinn p/s o/h rec ok
|
Conference | 8/24/2016 | 8/26/2016 | 8/26/2016 | P | DONE |
Bob Reichert
|
|
|
Would like to set up the pre-work conference at my house to discuss my new service for this upcoming Friday 08/26/2016 around 1:30pm, if possible. Phone #: ###-#### Inspection requested via web by Mike Quinn talked about replacing service and inspections, length of unprotected service conductors, branch circuits
|