Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberELE16-02784
StatusFinaled
Name SCOTT KAMM
Site Address 3527 W ROSE HILL ST
Project Name 
Customer Number 
ePlanReviewNo
Description
wiring for new single family dwelling
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final4/24/20194/25/20194/25/2019APASS
DetailsEric Story
Scott Phone #: ###-####
Corrections fixed final ok
Conference4/10/20194/10/20194/10/2019ADONE
DetailsEric Story
Conference for elecrical issues due to improper wiring
Discussed all corrections given per 327. Owner knows off all items needed and we came up with a plan to add receptacles in kitchen as required,also owner will move copper water lines in front of panel cover to provide as much room as he can
Final4/8/20194/8/20194/8/2019PFAIL
DetailsRock A. Hudson
Scott Phone #: ###-####
110.3- Installations shall be done as per manufacturers instructions. Level 2 bedroom has reverse polarity, all outdoor receptacle in use covers shall have proper covers.
110.26- Minimum work width shall be provided for 200 amp panel located in mechanical room.
210.8- GFCI protection shall be provided for all receptacles located with in 6' of a sink. Level 2 bed to right of vanity sink.
210.12- AFCI protection shall be provided for all outlets located in bedroom areas. level 3 no protection.
210.52(C)- Kitchen counter top areas shall have receptacles installed so that no point measured along wall line is more than 24" from a receptacle.
250.24(A)(5)- Grounding and grounded conductors shall be seperated on load side of service disconnect. Feeders to 200amp panel equipment ground terminated with grounded conductor. Verify others.
314.25- All boxes shall have covers. Misc through out.
406.12- All residential receptacles shall be tamper resistant type.
410.16- Luminaires located in clothes closets shall have totally enclosed lamps.
422.31- All hard wired appliances shall have a disconnecting means. 110.25- lockouts acceptacle.
424.45(E)- Verify or provide proof class A GFCI protection is provided by floor heat thermostats.
Master floor heat not installed, cover box.
Final3/15/20193/18/20193/18/2019AFAIL
DetailsMark Moncarr
Scott Phone #: ###-#### To many corrections to list. Did not go through entire house. Another conference is needed.
Electrical Rough-In7/16/20187/16/20187/16/2018PPASS
DetailsEric Story
Scott Phone #: ###-####
Train cars ok to oover
Electrical Rough-In7/13/20187/13/20187/13/2018PNR
DetailsEric Story
Scott - please call ahead Phone #: ###-####
Not ready needs nailplating done
Conference5/14/20185/14/20185/14/2018PPASS
DetailsEric Story
Scott Phone #: ###-####
Discussed wiring of train car all codes discussed and wall spacing(wiil need verification from manufacture for listing of wiring in foam panels)
Electrical Rough-In1/25/20181/26/20181/26/2018PPASS
DetailsEric Story
Scott Phone #: ###-####
u/g ok to cover
Electrical Rough-In4/17/20174/17/20174/17/2017PPASS
DetailsEric Story
Scott Phone #: ###-####
house ok cover
Electrical Rough-In4/5/20174/5/20174/5/2017PNR
DetailsEric Story
Scott Phone #: ###-####
Not ready at this time
Conference3/28/20173/29/20173/29/2017ADONE
DetailsEric Story
Call Scott ###-####
Discussed wiring outlet placement branch circuit and panels and all receptacle requirements arc fault protection, tamper receptacles,GFCI , weather res,spark rings, in-use covers,grounding and seperating grounded and grounding conductors, protection of nm cable.
Conference3/28/20173/28/20173/28/2017PCANC
DetailsEric Story
Scott Phone #: ###-####
Scheduled for 3-29-17
Electrical Rough-In8/26/20168/29/20168/29/2016PPASS
DetailsMark Moncarr
Scott Phone #: ###-#### u/g ok to cover.
Conference8/25/20168/25/20168/25/2016PDONE
DetailsRock A. Hudson
Scott Phone #: ###-####
Discussed the installation of underground from main service mounted on a pole to an interior wall of house. 18" minimum, under footing then reduce depth where under concrete floor. 360 degrees of bend max and grounding electode required. Owner talked about hiring contractor to wire house with foam panel walls.