Final | 4/24/2019 | 4/25/2019 | 4/25/2019 | A | PASS |
Eric Story
|
|
|
Scott Phone #: ###-#### Corrections fixed final ok
|
Conference | 4/10/2019 | 4/10/2019 | 4/10/2019 | A | DONE |
Eric Story
|
|
|
Conference for elecrical issues due to improper wiring Discussed all corrections given per 327. Owner knows off all items needed and we came up with a plan to add receptacles in kitchen as required,also owner will move copper water lines in front of panel cover to provide as much room as he can
|
Final | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Scott Phone #: ###-#### 110.3- Installations shall be done as per manufacturers instructions. Level 2 bedroom has reverse polarity, all outdoor receptacle in use covers shall have proper covers. 110.26- Minimum work width shall be provided for 200 amp panel located in mechanical room. 210.8- GFCI protection shall be provided for all receptacles located with in 6' of a sink. Level 2 bed to right of vanity sink. 210.12- AFCI protection shall be provided for all outlets located in bedroom areas. level 3 no protection. 210.52(C)- Kitchen counter top areas shall have receptacles installed so that no point measured along wall line is more than 24" from a receptacle. 250.24(A)(5)- Grounding and grounded conductors shall be seperated on load side of service disconnect. Feeders to 200amp panel equipment ground terminated with grounded conductor. Verify others. 314.25- All boxes shall have covers. Misc through out. 406.12- All residential receptacles shall be tamper resistant type. 410.16- Luminaires located in clothes closets shall have totally enclosed lamps. 422.31- All hard wired appliances shall have a disconnecting means. 110.25- lockouts acceptacle. 424.45(E)- Verify or provide proof class A GFCI protection is provided by floor heat thermostats. Master floor heat not installed, cover box.
|
Final | 3/15/2019 | 3/18/2019 | 3/18/2019 | A | FAIL |
Mark Moncarr
|
|
|
Scott Phone #: ###-#### To many corrections to list. Did not go through entire house. Another conference is needed.
|
Electrical Rough-In | 7/16/2018 | 7/16/2018 | 7/16/2018 | P | PASS |
Eric Story
|
|
|
Scott Phone #: ###-#### Train cars ok to oover
|
Electrical Rough-In | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | NR |
Eric Story
|
|
|
Scott - please call ahead Phone #: ###-#### Not ready needs nailplating done
|
Conference | 5/14/2018 | 5/14/2018 | 5/14/2018 | P | PASS |
Eric Story
|
|
|
Scott Phone #: ###-#### Discussed wiring of train car all codes discussed and wall spacing(wiil need verification from manufacture for listing of wiring in foam panels)
|
Electrical Rough-In | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | PASS |
Eric Story
|
|
|
Scott Phone #: ###-#### u/g ok to cover
|
Electrical Rough-In | 4/17/2017 | 4/17/2017 | 4/17/2017 | P | PASS |
Eric Story
|
|
|
Scott Phone #: ###-#### house ok cover
|
Electrical Rough-In | 4/5/2017 | 4/5/2017 | 4/5/2017 | P | NR |
Eric Story
|
|
|
Scott Phone #: ###-#### Not ready at this time
|
Conference | 3/28/2017 | 3/29/2017 | 3/29/2017 | A | DONE |
Eric Story
|
|
|
Call Scott ###-#### Discussed wiring outlet placement branch circuit and panels and all receptacle requirements arc fault protection, tamper receptacles,GFCI , weather res,spark rings, in-use covers,grounding and seperating grounded and grounding conductors, protection of nm cable.
|
Conference | 3/28/2017 | 3/28/2017 | 3/28/2017 | P | CANC |
Eric Story
|
|
|
Scott Phone #: ###-#### Scheduled for 3-29-17
|
Electrical Rough-In | 8/26/2016 | 8/29/2016 | 8/29/2016 | P | PASS |
Mark Moncarr
|
|
|
Scott Phone #: ###-#### u/g ok to cover.
|
Conference | 8/25/2016 | 8/25/2016 | 8/25/2016 | P | DONE |
Rock A. Hudson
|
|
|
Scott Phone #: ###-#### Discussed the installation of underground from main service mounted on a pole to an interior wall of house. 18" minimum, under footing then reduce depth where under concrete floor. 360 degrees of bend max and grounding electode required. Owner talked about hiring contractor to wire house with foam panel walls.
|